Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Morgan, Ohio (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD OH20260065-17008-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: OH20260065-17008-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Morgan
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference OH20260065View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.24 $18.65 $50.89 +65% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.02 $22.94 $56.96 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $25.75 $12.99 $38.74 +38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.12 $17.40 $52.52 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $33.32 $73.32 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LOW VOLTAGE WIRING ONLY $28.00 $9.72 $37.72 Bottom 10% +29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LOW VOLTAGE WIRING ONLY $25.15 $17.44 $42.59 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $36.00 $23.57 $59.57 +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $29.10 $19.73 $48.83 +41% vs market $0.00 $0.00 $0.00 $0.00
LABORER $40.97 $14.10 $55.07 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $24.62 $8.51 $33.13 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $32.16 $12.95 $45.11 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.37 $4.79 $23.16 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.69 $8.01 $30.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.91 $10.42 $34.33 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $30.28 $24.46 $54.74 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.73 $37.60 $72.33 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $34.73 $37.60 $72.33 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $44.02 $16.41 $60.43 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $42.98 $16.41 $59.39 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.59 $15.17 $44.76 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.53 $26.36 $59.89 +98% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.52 $29.87 $65.39 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $48.28 $28.08 $76.36 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.31 $10.45 $38.76 +63% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $29.92 $16.77 $46.69 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $19.33 $6.55 $25.88 -7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Morgan, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Morgan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260065-17008-bld →