Building Construction — Miami, Ohio

WD OH20260092-14484-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Miami, Ohio (construction type: building) is $35.23/hr base + $23.04/hr fringe = $58.27/hr total package (WD OH20260092-14484-bld, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: OH20260092-14484-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Miami
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference OH20260092View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $35.23 $23.04 $58.27 +114% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.30 $18.28 $51.58 +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.80 $7.13 $28.93 +3% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $26.07 $12.34 $38.41 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $21.02 $4.21 $25.23 Top 10% -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.00 $22.49 $60.49 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $22.41 $9.01 $31.42 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $31.95 $18.20 $50.15 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.39 $25.35 $62.74 +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $37.77 $23.90 $61.67 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER (ASBESTOS ABATEMENT) $31.65 $12.95 $44.60 Bottom 10% +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.55 $6.44 $25.99 Above median +9% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $32.25 $12.95 $45.20 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.95 $8.60 $31.55 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.98 $8.58 $32.56 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $31.97 $9.08 $41.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $30.26 $12.58 $42.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $26.01 $4.95 $30.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $29.99 $12.80 $42.79 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.56 $16.37 $43.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.28 $13.29 $43.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.25 $12.61 $40.86 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $29.15 $13.97 $43.12 +67% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.78 $12.40 $35.18 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $57.41 $38.44 $95.85 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.00 $32.56 $83.56 Above median +178% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.05 $27.18 $70.23 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.92 $19.66 $52.58 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $28.87 $19.66 $48.53 +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $32.42 $19.66 $52.08 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $34.38 $19.94 $54.32 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $24.11 $12.98 $37.09 +23% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $28.10 $23.41 $51.51 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $48.28 $28.08 $76.36 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.28 $11.05 $39.33 +65% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $30.98 $15.82 $46.80 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $22.08 $11.51 $33.59 Above median +20% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Miami, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Miami

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260092-14484-bld →