Building Construction — Jackson, Ohio

WD OH20260064-14500-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Jackson, Ohio (construction type: building) is $38.05/hr base + $30.87/hr fringe = $68.92/hr total package (WD OH20260064-14500-bld, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: OH20260064-14500-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Jackson
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference OH20260064View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.05 $30.87 $68.92 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $30.18 $20.23 $50.41 +64% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.00 $17.36 $51.36 +67% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $25.80 $12.54 $38.34 +37% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $20.66 $4.91 $25.57 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $22.27 $14.40 $36.67 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.00 $22.26 $59.26 +94% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $33.32 $73.32 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $14.33 $47.22 +61% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.70 $29.59 $69.29 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.00 $23.57 $59.57 +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $29.44 $22.68 $52.12 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER $40.97 $14.10 $55.07 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.37 $4.79 $23.16 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $29.18 $10.69 $39.87 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.69 $8.01 $30.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.91 $10.42 $34.33 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $30.28 $24.46 $54.74 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $57.41 $38.44 $95.85 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDES HVAC PIPE INSTALLATION $43.05 $27.18 $70.23 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDES HVAC PIPE INSTALLATION $53.00 $27.59 $80.59 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDES HVAC PIPE INSTALLATION $38.89 $28.56 $67.45 +124% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $38.89 $28.56 $67.45 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $44.02 $16.41 $60.43 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $42.98 $16.41 $59.39 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.19 $15.73 $45.92 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.53 $26.36 $59.89 +98% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $31.73 $27.44 $59.17 +96% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $48.28 $28.08 $76.36 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.31 $10.45 $38.76 +63% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $29.92 $16.77 $46.69 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $19.33 $6.55 $25.88 -7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260064-14500-bld →