Building Construction — Hardin, Ohio

WD OH20260066-14491-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Hardin, Ohio (construction type: building) is $37.00/hr base + $28.27/hr fringe = $65.27/hr total package (WD OH20260066-14491-bld, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: OH20260066-14491-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Hardin
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference OH20260066View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $37.00 $28.27 $65.27 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $31.00 $15.15 $46.15 Above median $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $35.67 $24.75 $60.42 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $27.47 $12.26 $39.73 +29% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TILE FINISHER $26.88 $11.81 $38.69 Above median +26% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TILE SETTER $29.90 $16.52 $46.42 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.09 $9.08 $30.17 +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.47 $10.07 $33.54 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $18.57 $3.12 $21.69 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $17.63 $5.64 $23.27 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.40 $25.24 $73.64 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $36.50 $25.06 $61.56 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.50 $29.20 $64.70 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.00 $23.57 $59.57 +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $33.18 $23.73 $56.91 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.73 $11.80 $40.53 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER $32.35 $16.42 $48.77 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.67 $8.30 $29.97 Above median +26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.39 $0.00 $10.39 Above median -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $22.74 $8.60 $31.34 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.37 $4.79 $23.16 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.59 $7.76 $32.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.00 $3.26 $23.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $23.50 $7.51 $31.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.43 $2.72 $20.15 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $25.85 $10.42 $36.27 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $17.91 $10.85 $28.76 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.00 $32.56 $83.56 Above median +178% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $51.00 $32.56 $83.56 Above median +178% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $29.57 $17.20 $46.77 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $42.98 $16.41 $59.39 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.07 $19.84 $48.91 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.58 $35.15 $74.73 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $22.05 $12.18 $34.23 +13% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $30.25 $25.16 $55.41 +98% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $25.91 $9.18 $35.09 +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $17.97 $4.14 $22.11 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hardin, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hardin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260066-14491-bld →