Building Construction — Geauga, Ohio

WD OH20260080-14451-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Geauga, Ohio (construction type: building) is $43.88/hr base + $26.93/hr fringe = $70.81/hr total package (WD OH20260080-14451-bld, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: OH20260080-14451-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Geauga
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference OH20260080View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.88 $26.93 $70.81 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $38.13 $20.19 $58.32 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $38.01 $20.64 $58.65 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $37.52 $23.50 $61.02 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.06 $3.97 $35.03 +25% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.87 $12.74 $44.61 +59% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.58 $23.71 $59.29 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE $33.05 $14.91 $47.96 Above median $0.00 $0.00 $0.00 $0.00
DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE $46.63 $24.92 $71.55 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.17 $24.58 $65.75 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACAT $46.63 $24.92 $71.55 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $34.82 $20.80 $55.62 +90% vs market $0.00 $0.00 $0.00 $0.00
LABORER $31.89 $22.66 $54.55 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $24.53 $14.55 $39.08 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.59 $5.44 $40.03 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $31.27 $10.90 $42.17 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $30.95 $10.20 $41.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $32.88 $12.26 $45.14 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.15 $8.72 $29.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $29.66 $12.61 $42.27 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $31.48 $12.80 $44.28 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $31.48 $12.80 $44.28 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $35.45 $20.20 $55.65 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.35 $19.45 $51.80 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.78 $12.40 $35.18 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $63.79 $38.44 $102.23 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $36.34 $27.50 $63.84 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $49.17 $28.55 $77.72 Above median +159% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $29.51 $15.67 $45.18 +48% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $44.86 $30.03 $74.89 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $36.93 $16.41 $53.34 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.92 $19.66 $52.58 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $46.71 $16.41 $63.12 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $28.87 $19.66 $48.53 +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $32.42 $19.66 $52.08 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.15 $21.28 $61.43 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.06 $30.11 $73.17 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $37.52 $23.50 $61.02 +119% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.17 $28.55 $77.72 Above median +159% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $31.50 $16.23 $47.73 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $36.07 $19.49 $55.56 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $24.32 $11.73 $36.05 Above median +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Geauga, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.