Residential Construction — Clinton, Ohio

WD OH20260003-14480-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Clinton, Ohio (construction type: residential) is $19.90/hr base + $6.25/hr fringe = $26.15/hr total package (WD OH20260003-14480-res, Rev. 1).

Scroll down for all 7 trade classifications covered by this determination.

WD Number: OH20260003-14480-res
Revision: 1
Construction Type: residential
State: Ohio (OH)
County: Clinton
Effective: May 17, 2026
Trades covered: 7
Official source: SAM.gov reference OH20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $19.90 $6.25 $26.15 -7% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.53 $23.04 $57.57 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.34 $14.21 $37.55 +23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.40 $6.25 $23.65 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $37.14 $15.20 $52.34 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $36.92 $24.01 $60.93 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.13 $11.72 $30.85 +2% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Clinton, OH — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Clinton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260003-14480-res →