Building Construction — Allen, Ohio

WD OH20260068-14488-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Allen, Ohio (construction type: building) is $35.23/hr base + $23.04/hr fringe = $58.27/hr total package (WD OH20260068-14488-bld, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: OH20260068-14488-bld
Revision: 1
Construction Type: building
State: Ohio (OH)
County: Allen
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference OH20260068View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $35.23 $23.04 $58.27 +114% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.12 $18.95 $53.07 +72% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $19.34 $5.76 $25.10 -10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.73 $24.65 $60.38 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $20.48 $5.44 $25.92 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.00 $22.49 $60.49 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC: DUCT INSTALLATION $19.57 $0.00 $19.57 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $37.39 $25.35 $62.74 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.38 $6.14 $28.52 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $37.77 $23.90 $61.67 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.41 $12.95 $45.36 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $32.25 $12.95 $45.20 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.95 $8.60 $31.55 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.98 $8.58 $32.56 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $29.73 $8.29 $38.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $30.26 $12.58 $42.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $26.01 $4.95 $30.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $29.87 $10.91 $40.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.56 $16.37 $43.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.28 $13.29 $43.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.25 $12.61 $40.86 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $24.54 $1.25 $25.79 +0% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.78 $12.40 $35.18 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.00 $32.56 $83.56 Above median +178% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $42.76 $30.81 $73.57 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.92 $19.66 $52.58 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $44.14 $16.41 $60.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $28.87 $19.66 $48.53 +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $32.42 $19.66 $52.08 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.07 $19.84 $48.91 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $31.23 $25.79 $57.02 +88% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $25.44 $11.11 $36.55 +22% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $24.87 $10.66 $35.53 +49% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $29.69 $16.58 $46.27 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $22.08 $11.51 $33.59 Above median +20% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Allen, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Allen

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OH20260068-14488-bld →