Building Construction — Allen, Ohio
WD OH20260068-14488-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Allen, Ohio (construction type: building) is $35.23/hr base + $23.04/hr fringe = $58.27/hr total package (WD OH20260068-14488-bld, Rev. 1).
Scroll down for all 35 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $34.12 | $18.95 | $53.07 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.34 | $5.76 | $25.10 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $35.73 | $24.65 | $60.38 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $20.48 | $5.44 | $25.92 Above median -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.00 | $22.49 | $60.49 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC: DUCT INSTALLATION | $19.57 | $0.00 | $19.57 Above median -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $37.39 | $25.35 | $62.74 Above median +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $22.38 | $6.14 | $28.52 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $32.41 | $12.95 | $45.36 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $32.25 | $12.95 | $45.20 Above median +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.95 | $8.60 | $31.55 Above median +32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 Above median +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.73 | $8.29 | $38.02 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $26.01 | $4.95 | $30.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $29.87 | $10.91 | $40.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $30.28 | $13.29 | $43.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $28.25 | $12.61 | $40.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $24.54 | $1.25 | $25.79 +0% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 Above median +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $51.00 | $32.56 | $83.56 Above median +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $42.76 | $30.81 | $73.57 Above median +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $32.92 | $19.66 | $52.58 Above median +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 | $60.55 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 Above median +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $29.07 | $19.84 | $48.91 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.23 | $25.79 | $57.02 +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $25.44 | $11.11 | $36.55 +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $24.87 | $10.66 | $35.53 +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $29.69 | $16.58 | $46.27 Above median +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP | $22.08 | $11.51 | $33.59 Above median +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Allen, OH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Allen
Compliance Notes
- This wage determination applies to federal contracts for building construction in Allen, Ohio.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.