Heavy Construction — McLean, North Dakota

WD ND20260047-17688-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in McLean, North Dakota (construction type: heavy) is $35.87/hr base + $25.10/hr fringe = $60.97/hr total package (WD ND20260047-17688-hvy, Rev. 2).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: ND20260047-17688-hvy
Revision: 2
Construction Type: heavy
State: North Dakota (ND)
County: McLean
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference ND20260047View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $35.87 $25.10 $60.97 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.33 $0.00 $24.33 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.98 $18.38 $63.36 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $25.28 $0.00 $25.28 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON OR GENERAL $28.83 $21.15 $49.98 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $29.92 $15.43 $45.35 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $28.00 $0.00 $28.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $31.06 $15.71 $46.77 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $34.00 $22.45 $56.45 +87% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $35.00 $22.45 $57.45 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $35.25 $22.45 $57.70 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $34.85 $22.45 $57.30 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $34.85 $22.45 $57.30 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $31.95 $18.80 $50.75 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the McLean, ND — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in McLean

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ND20260047-17688-hvy →