Building Construction — McIntosh, North Dakota

WD ND20260033-17722-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AN JIB CONFIGURATION 160' AND OVER in McIntosh, North Dakota (construction type: building) is $40.20/hr base + $25.25/hr fringe = $65.45/hr total package (WD ND20260033-17722-bld, Rev. 2).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: ND20260033-17722-bld
Revision: 2
Construction Type: building
State: North Dakota (ND)
County: McIntosh
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference ND20260033View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AN JIB CONFIGURATION 160' AND OVER $40.20 $25.25 $65.45 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.00 $31.14 $79.14 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $24.60 $10.28 $34.88 +20% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.87 $3.83 $22.70 -19% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.33 $18.40 $53.73 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.41 $18.62 $56.03 +77% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $16.68 $2.17 $18.85 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $35.95 $33.11 $69.06 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.02 $15.21 $43.23 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.87 $3.18 $16.05 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.48 $4.00 $26.48 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.23 $12.65 $33.88 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.00 $12.45 $33.45 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $20.46 $0.00 $20.46 -26% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.94 $20.46 $64.40 +114% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $23.09 $5.16 $28.25 -6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANES UP TO 149 TONS, CRANE OPERATOR UP TO 179' OF BOOM OR JIB, ANY COMBINATION ALL TYPES, GENTRY CRANE OPERATO $40.20 $25.25 $65.45 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT $39.60 $25.25 $64.85 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $28.88 $8.20 $37.08 -2% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.80 $8.52 $35.32 -7% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $20.95 $0.00 $20.95 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the McIntosh, ND — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in McIntosh

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ND20260033-17722-bld →