Heavy Construction — Cass, North Dakota

WD ND20260050-17763-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Cass, North Dakota (construction type: heavy) is $26.68/hr base + $5.60/hr fringe = $32.28/hr total package (WD ND20260050-17763-hvy, Rev. 2).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: ND20260050-17763-hvy
Revision: 2
Construction Type: heavy
State: North Dakota (ND)
County: Cass
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference ND20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $26.68 $5.60 $32.28 +15% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.00 $0.00 $24.00 -11% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.98 $18.38 $63.36 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $39.80 $24.47 $64.27 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.80 $24.47 $64.27 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.79 $0.00 $18.79 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.14 $0.00 $23.14 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.91 $14.85 $39.76 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.01 $0.00 $20.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.29 $0.00 $24.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.10 $14.85 $40.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.00 $0.00 $28.00 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $35.00 $22.45 $57.45 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR SCRAPER $35.00 $22.45 $57.45 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $35.00 $22.45 $57.45 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $35.25 $22.45 $57.70 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $34.85 $22.45 $57.30 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $34.27 $19.28 $53.55 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cass, ND — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cass

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ND20260050-17763-hvy →