Residential Construction — Burleigh, North Dakota

WD ND20260003-17839-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Burleigh, North Dakota (construction type: residential) is $32.68/hr base + $13.42/hr fringe = $46.10/hr total package (WD ND20260003-17839-res, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: ND20260003-17839-res
Revision: 1
Construction Type: residential
State: North Dakota (ND)
County: Burleigh
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference ND20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $32.68 $13.42 $46.10 +59% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (CARPENTERS) $10.90 $0.00 $10.90 Top 10% -61% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $9.85 $0.00 $9.85 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.61 $1.06 $14.67 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $14.64 $0.00 $14.64 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.94 $17.69 $56.63 +79% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE SPLICER $33.20 $14.62 $47.82 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR, BATT & BLOWN $8.00 $0.00 $8.00 -67% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $8.41 $0.00 $8.41 -64% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $8.39 $0.00 $8.39 -64% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $10.00 $0.00 $10.00 -64% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $11.42 $0.00 $11.42 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $18.10 $0.00 $18.10 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: LOADER $18.10 $0.00 $18.10 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $8.13 $0.00 $8.13 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL (SHEET METAL WORK) $12.62 $0.00 $12.62 -67% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $39.04 $23.99 $63.03 +109% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Burleigh, ND — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Burleigh

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ND20260003-17839-res →