Building Construction — Burke, North Dakota

WD ND20260035-17685-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Burke, North Dakota (construction type: building) is $48.00/hr base + $31.14/hr fringe = $79.14/hr total package (WD ND20260035-17685-bld, Rev. 2).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: ND20260035-17685-bld
Revision: 2
Construction Type: building
State: North Dakota (ND)
County: Burke
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference ND20260035View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $48.00 $31.14 $79.14 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.16 $15.24 $48.40 +67% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $23.66 $7.35 $31.01 +10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.33 $18.40 $53.73 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.94 $18.22 $59.16 +87% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $16.38 $6.24 $22.62 Top 10% $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $17.39 $2.10 $19.49 -19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.95 $33.11 $69.06 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER $29.20 $22.19 $51.39 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $29.20 $22.19 $51.39 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.97 $4.00 $26.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.23 $12.65 $33.88 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $27.00 $15.65 $42.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $26.40 $13.58 $39.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.00 $12.45 $33.45 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $18.18 $0.00 $18.18 -34% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.94 $20.46 $64.40 +114% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $40.53 $20.60 $61.13 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.60 $25.25 $64.85 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.34 $22.67 $57.01 +50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $20.95 $0.00 $20.95 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Burke, ND — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.