Highway Construction — Polk, North Carolina

WD NC20260086-16144-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLASTER in Polk, North Carolina (construction type: highway) is $21.83/hr base + $0.00/hr fringe = $21.83/hr total package (WD NC20260086-16144-hwy, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: NC20260086-16144-hwy
Revision: 1
Construction Type: highway
State: North Carolina (NC)
County: Polk
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference NC20260086View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLASTER $21.83 $0.00 $21.83 $0.00 $0.00 $0.00 $0.00
CARPENTER $12.54 $0.00 $12.54 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.10 $0.00 $14.10 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.13 $0.00 $15.13 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.19 $2.39 $21.58 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $14.53 $0.00 $14.53 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER $15.85 $0.00 $15.85 -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.22 $0.00 $12.22 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.43 $0.00 $13.43 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.68 $0.00 $10.68 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.26 $0.00 $12.26 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.00 $0.00 $10.00 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER $15.22 $0.00 $15.22 -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.23 $0.00 $12.23 -40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $19.62 $0.00 $19.62 -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.67 $0.06 $14.73 -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $20.79 $0.00 $20.79 -12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.53 $0.00 $11.53 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.87 $0.00 $13.87 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.75 $0.00 $11.75 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.98 $0.04 $15.02 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.33 $0.00 $13.33 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.98 $0.00 $14.98 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.01 $0.00 $16.01 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.38 $0.00 $13.38 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.07 $0.00 $13.07 -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $19.24 $0.00 $19.24 -18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.10 $0.00 $13.10 -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.11 $0.00 $16.11 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.44 $0.53 $14.97 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.20 $0.00 $16.20 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.00 $0.00 $11.00 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE) $17.39 $0.00 $17.39 Top 10% -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 14.05 0.06 POWER EQUIPMENT OPERATOR $15.68 $0.05 $15.73 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 20.92 0.00 POWER EQUIPMENT OPERATOR $15.25 $0.00 $15.25 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 24.66 0.00 POWER EQUIPMENT OPERATOR $13.89 $0.00 $13.89 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR..$ 21.25 0.00 POWER EQUIPMENT OPERATOR $19.59 $0.00 $19.59 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.51 $0.00 $18.51 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $13.88 $0.00 $13.88 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.50 $0.00 $13.50 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $11.72 $0.00 $11.72 -51% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Polk, NC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Polk

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260086-16144-hwy →