Building Construction — Mitchell, North Carolina

WD NC20260061-16143-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Mitchell, North Carolina (construction type: building) is $18.45/hr base + $4.18/hr fringe = $22.63/hr total package (WD NC20260061-16143-bld, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: NC20260061-16143-bld
Revision: 1
Construction Type: building
State: North Carolina (NC)
County: Mitchell
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference NC20260061View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.45 $4.18 $22.63 -3% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.59 $2.31 $19.90 -13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 15.60 2.25 CARPENTER $14.28 $1.13 $15.41 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.02 $0.00 $14.02 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.37 $0.40 $15.77 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $16.94 $3.04 $19.98 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.75 $5.62 $24.37 +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.07 $1.10 $12.17 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.29 $1.82 $12.11 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE $10.00 $0.00 $10.00 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.60 $1.41 $20.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.25 $2.37 $21.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.25 $1.52 $16.77 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.77 $1.87 $16.64 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $31.66 $12.69 $44.35 +81% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC UNIT INSTALLATION $17.51 $2.33 $19.84 Top 10% -19% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.55 $0.80 $14.35 -38% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $15.62 $2.09 $17.71 Bottom 10% -30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $13.61 $1.10 $14.71 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.50 $1.36 $13.86 -42% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mitchell, NC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mitchell

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260061-16143-bld →