Highway Construction — Iredell, North Carolina

WD NC20260089-16156-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLASTER in Iredell, North Carolina (construction type: highway) is $21.85/hr base + $0.00/hr fringe = $21.85/hr total package (WD NC20260089-16156-hwy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: NC20260089-16156-hwy
Revision: 1
Construction Type: highway
State: North Carolina (NC)
County: Iredell
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference NC20260089View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLASTER $21.85 $0.00 $21.85 $0.00 $0.00 $0.00 $0.00
CARPENTER $13.98 $0.00 $13.98 -39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.67 $0.00 $13.67 -40% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $14.96 $1.07 $16.03 Bottom 10% -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.19 $2.39 $21.58 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $14.53 $0.00 $14.53 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER $16.29 $0.00 $16.29 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.43 $0.00 $13.43 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.26 $0.00 $12.26 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.21 $0.00 $10.21 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER $14.03 $0.00 $14.03 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.75 $0.00 $11.75 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.45 $0.13 $10.58 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.36 $0.43 $13.79 -32% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $19.62 $0.00 $19.62 -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.60 $0.00 $15.60 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $19.99 $0.00 $19.99 -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.53 $0.00 $11.53 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.59 $0.00 $13.59 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.48 $0.00 $13.48 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.67 $0.00 $13.67 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.63 $0.00 $11.63 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.36 $0.00 $16.36 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.90 $0.00 $12.90 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.48 $0.00 $14.48 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.67 $1.52 $14.19 -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.48 $0.00 $15.48 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $19.40 $0.00 $19.40 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.07 $0.74 $14.81 -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.09 $1.52 $17.61 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.83 $0.00 $14.83 -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.92 $0.00 $16.92 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.14 $0.00 $12.14 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE) $17.39 $0.00 $17.39 Top 10% -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 12.91 0.00 POWER EQUIPMENT OPERATOR $15.07 $0.00 $15.07 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 19.24 0.00 POWER EQUIPMENT OPERATOR $15.43 $1.61 $17.04 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 25.00 0.00 POWER EQUIPMENT OPERATOR $15.58 $0.00 $15.58 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR..$ 21.25 0.00 POWER EQUIPMENT OPERATOR $21.05 $0.00 $21.05 Top 10% -10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.86 $0.00 $18.86 -20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $16.26 $0.00 $16.26 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.50 $0.15 $13.65 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.58 $0.00 $10.58 -56% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Iredell, NC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Iredell

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260089-16156-hwy →