Residential Construction — Guilford, North Carolina

WD NC20260121-16280-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Guilford, North Carolina (construction type: residential) is $18.62/hr base + $0.00/hr fringe = $18.62/hr total package (WD NC20260121-16280-res, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: NC20260121-16280-res
Revision: 1
Construction Type: residential
State: North Carolina (NC)
County: Guilford
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference NC20260121View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.62 $0.00 $18.62 -20% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.90 $0.00 $15.90 -31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.62 $0.00 $15.62 -31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.12 $0.00 $19.12 -26% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $14.37 $0.00 $14.37 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.71 $0.00 $15.71 -35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.89 $0.00 $16.89 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.91 $0.00 $12.91 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.00 $0.00 $13.00 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.49 $0.00 $13.49 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.17 $0.00 $12.17 -40% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.50 $1.47 $19.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.50 $1.56 $20.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.83 $0.00 $16.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.83 $0.00 $15.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.12 $0.00 $15.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.45 $0.00 $17.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.55 $0.00 $13.55 $0.00 $0.00 $0.00 $0.00
PAINTER $13.70 $0.00 $13.70 -35% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $15.06 $0.00 $15.06 -29% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $19.56 $0.00 $19.56 -20% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.14 $0.00 $15.14 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $16.43 $0.00 $16.43 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.13 $0.48 $15.61 -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $14.77 $0.00 $14.77 Above median -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Guilford, NC — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Guilford

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260121-16280-res →