Highway Construction — Gates, North Carolina

WD NC20260091-16860-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLASTER in Gates, North Carolina (construction type: highway) is $21.85/hr base + $0.00/hr fringe = $21.85/hr total package (WD NC20260091-16860-hwy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: NC20260091-16860-hwy
Revision: 1
Construction Type: highway
State: North Carolina (NC)
County: Gates
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference NC20260091View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLASTER $21.85 $0.00 $21.85 $0.00 $0.00 $0.00 $0.00
CARPENTER $13.72 $0.00 $13.72 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.26 $0.00 $14.26 -37% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $14.72 $1.67 $16.39 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.69 $2.66 $21.35 -18% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $16.32 $0.00 $16.32 Bottom 10% -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER $16.88 $0.00 $16.88 -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.39 $0.00 $13.39 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.35 $0.00 $11.35 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.85 $0.00 $10.85 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.48 $0.00 $13.48 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.42 $0.00 $12.42 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.12 $0.00 $10.12 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.31 $0.00 $13.31 -34% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $19.62 $0.00 $19.62 -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.56 $0.00 $14.56 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $19.29 $0.00 $19.29 -18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $10.17 $0.00 $10.17 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.98 $0.00 $13.98 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $10.48 $0.00 $10.48 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.65 $0.00 $13.65 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.87 $0.00 $11.87 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.45 $0.00 $13.45 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $9.30 $0.00 $9.30 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.58 $0.00 $13.58 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $10.28 $0.00 $10.28 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.28 $0.00 $15.28 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.73 $0.00 $16.73 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.99 $0.00 $12.99 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.61 $0.00 $17.61 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.25 $0.00 $17.25 -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $18.46 $0.00 $18.46 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.28 $0.00 $13.28 -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE) $17.39 $0.00 $17.39 Top 10% -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 12.13 0.00 POWER EQUIPMENT OPERATOR $15.53 $0.00 $15.53 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 19.12 0.00 POWER EQUIPMENT OPERATOR $15.43 $1.61 $17.04 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 24.66 0.00 POWER EQUIPMENT OPERATOR $14.09 $0.00 $14.09 Top 10% -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR..$ 19.00 0.00 POWER EQUIPMENT OPERATOR $21.48 $0.00 $21.48 Top 10% -9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.63 $0.00 $18.63 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $14.38 $0.00 $14.38 -39% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.04 $0.00 $12.04 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.35 $0.00 $10.35 -57% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Gates, NC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Gates

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260091-16860-hwy →