Building Construction — Gaston, North Carolina

WD NC20260005-16155-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Gaston, North Carolina (construction type: building) is $19.00/hr base + $0.00/hr fringe = $19.00/hr total package (WD NC20260005-16155-bld, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: NC20260005-16155-bld
Revision: 1
Construction Type: building
State: North Carolina (NC)
County: Gaston
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference NC20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $19.00 $0.00 $19.00 -18% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $19.78 $5.50 $25.28 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.79 $0.00 $18.79 -18% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $29.00 $11.20 $40.20 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.31 $13.66 $45.97 +77% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $29.75 $18.00 $47.75 +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.12 $2.79 $16.91 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.17 $0.00 $13.17 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $4.54 $17.54 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.00 $2.46 $17.46 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.50 $0.08 $16.58 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.54 $2.63 $20.17 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $16.75 $0.00 $16.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $22.68 $3.27 $25.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.31 $1.46 $16.77 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $15.55 $1.05 $16.60 -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $33.96 $13.48 $47.44 +93% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $22.96 $4.81 $27.77 +13% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.74 $16.51 $47.25 +88% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.67 13.27 ROOFER $18.26 $4.38 $22.64 Top 10% -10% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $18.35 $3.06 $21.41 Bottom 10% -13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.56 $3.09 $19.65 Above median -18% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Gaston, NC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Gaston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260005-16155-bld →