Highway Construction — Edgecombe, North Carolina

WD NC20260090-16289-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLASTER in Edgecombe, North Carolina (construction type: highway) is $21.04/hr base + $0.00/hr fringe = $21.04/hr total package (WD NC20260090-16289-hwy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: NC20260090-16289-hwy
Revision: 1
Construction Type: highway
State: North Carolina (NC)
County: Edgecombe
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference NC20260090View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLASTER $21.04 $0.00 $21.04 $0.00 $0.00 $0.00 $0.00
CARPENTER $13.72 $0.00 $13.72 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.48 $0.00 $14.48 -36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $16.79 $0.63 $17.42 -33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.97 $0.00 $17.97 -31% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $16.02 $0.00 $16.02 Bottom 10% -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER $14.89 $0.00 $14.89 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.87 $0.00 $12.87 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.54 $0.00 $12.54 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.88 $0.00 $12.88 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER $14.33 $0.00 $14.33 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.46 $0.00 $12.46 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.20 $0.00 $10.20 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.17 $0.00 $12.17 -40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $24.57 $0.00 $24.57 +16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.52 $0.00 $14.52 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.50 $0.00 $16.50 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.35 $0.00 $11.35 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.71 $0.00 $12.71 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.36 $0.00 $11.36 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.85 $0.00 $13.85 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.59 $0.00 $15.59 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.11 $0.00 $12.11 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.55 $0.00 $13.55 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.14 $0.00 $14.14 -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.76 $0.00 $13.76 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.62 $0.00 $14.62 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $18.47 $0.00 $18.47 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.00 $0.00 $14.00 -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.60 $0.00 $16.60 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $20.54 $0.00 $20.54 -13% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.04 $0.00 $17.04 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.85 $0.00 $11.85 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE) $15.18 $0.00 $15.18 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 12.45 0.00 POWER EQUIPMENT OPERATOR $18.20 $0.00 $18.20 Top 10% -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 20.34 2.30 POWER EQUIPMENT OPERATOR $14.34 $0.00 $14.34 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 21.14 0.00 POWER EQUIPMENT OPERATOR $14.38 $0.00 $14.38 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR..$ 20.67 0.00 POWER EQUIPMENT OPERATOR $20.08 $0.00 $20.08 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $17.55 $0.00 $17.55 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $15.36 $0.00 $15.36 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.37 $0.00 $12.37 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $11.12 $0.00 $11.12 -53% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Edgecombe, NC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Edgecombe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260090-16289-hwy →