Highway Construction — Durham, North Carolina

WD NC20260088-16288-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLASTER in Durham, North Carolina (construction type: highway) is $18.64/hr base + $0.00/hr fringe = $18.64/hr total package (WD NC20260088-16288-hwy, Rev. 1).

Scroll down for all 43 trade classifications covered by this determination.

WD Number: NC20260088-16288-hwy
Revision: 1
Construction Type: highway
State: North Carolina (NC)
County: Durham
Effective: May 17, 2026
Trades covered: 43
Official source: SAM.gov reference NC20260088View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLASTER $18.64 $0.00 $18.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $13.68 $0.05 $13.73 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.93 $0.00 $13.93 -39% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.19 $1.25 $16.44 -37% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.79 $2.72 $21.51 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $13.30 $0.00 $13.30 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER $15.65 $0.24 $15.89 -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.22 $0.00 $13.22 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.04 $0.00 $11.04 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.51 $0.27 $12.78 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER $14.50 $0.00 $14.50 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.78 $0.00 $12.78 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.40 $0.01 $10.41 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.43 $0.00 $12.43 -39% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $23.77 $0.00 $23.77 +13% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.82 $0.00 $14.82 -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $19.60 $0.00 $19.60 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.50 $0.00 $11.50 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.65 $0.00 $12.65 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.08 $0.00 $12.08 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.76 $0.00 $13.76 -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.97 $0.00 $15.97 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.05 $0.00 $12.05 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.16 $0.00 $14.16 -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.83 $0.00 $11.83 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.19 $0.00 $16.19 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.31 $0.00 $13.31 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.47 $0.00 $15.47 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $19.84 $0.00 $19.84 -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.63 $0.00 $13.63 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.95 $0.00 $16.95 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $18.19 $0.00 $18.19 -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.13 $0.00 $16.13 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $10.00 $0.00 $10.00 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE) $15.44 $0.00 $15.44 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 12.79 0.00 POWER EQUIPMENT OPERATOR $18.20 $0.00 $18.20 Top 10% -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 17.92 0.00 POWER EQUIPMENT OPERATOR $14.36 $0.00 $14.36 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 20.89 0.00 POWER EQUIPMENT OPERATOR $14.28 $0.00 $14.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR..$ 19.10 0.00 POWER EQUIPMENT OPERATOR $19.83 $0.00 $19.83 Top 10% -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $17.51 $0.00 $17.51 -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $15.22 $0.00 $15.22 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.57 $0.03 $13.60 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $11.45 $0.00 $11.45 -52% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Durham, NC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Durham

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260088-16288-hwy →