Residential Construction — Chatham, North Carolina
WD NC20260115-16276-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Chatham, North Carolina (construction type: residential) is $18.62/hr base + $0.00/hr fringe = $18.62/hr total package (WD NC20260115-16276-res, Rev. 1).
Scroll down for all 29 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $18.62 | $0.00 | $18.62 -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $17.33 | $0.00 | $17.33 -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.63 | $0.00 | $14.63 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $10.00 | $0.00 | $10.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $11.65 | $0.00 | $11.65 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION | $16.00 | $1.19 | $17.19 Bottom 10% -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $15.57 | $0.00 | $15.57 Bottom 10% -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $17.45 | $1.61 | $19.06 Above median -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $15.71 | $0.00 | $15.71 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $16.89 | $0.00 | $16.89 -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.60 | $0.00 | $11.60 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $14.25 | $1.56 | $15.81 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $13.32 | $0.00 | $13.32 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.49 | $0.00 | $13.49 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $11.79 | $0.58 | $12.37 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.50 | $1.47 | $19.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.50 | $1.56 | $20.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.83 | $0.00 | $16.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.83 | $0.00 | $15.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $15.12 | $0.00 | $15.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $17.45 | $0.00 | $17.45 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $13.55 | $0.00 | $13.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $12.38 | $0.00 | $12.38 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $9.87 | $0.00 | $9.87 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $17.17 | $0.00 | $17.17 -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $14.60 | $0.00 | $14.60 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $16.75 | $0.00 | $16.75 Bottom 10% -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.13 | $0.48 | $15.61 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $14.77 | $0.00 | $14.77 Above median -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Chatham, NC — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Chatham, North Carolina.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.