Building Construction — Bladen, North Carolina

WD NC20260063-16167-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Bladen, North Carolina (construction type: building) is $19.09/hr base + $8.73/hr fringe = $27.82/hr total package (WD NC20260063-16167-bld, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: NC20260063-16167-bld
Revision: 1
Construction Type: building
State: North Carolina (NC)
County: Bladen
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference NC20260063View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $19.09 $8.73 $27.82 +20% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 15.93 2.99 CARPENTER $18.13 $1.31 $19.44 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.02 $0.00 $14.02 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.36 $3.07 $20.43 -21% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $16.08 $3.48 $19.56 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $18.16 $0.87 $19.03 Bottom 10% -10% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $15.41 $2.60 $18.01 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.75 $5.62 $24.37 +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.53 $1.39 $11.92 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.29 $1.82 $12.11 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE $11.31 $0.00 $11.31 Top 10% -44% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.98 $0.91 $18.89 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.25 $2.37 $21.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.71 $1.49 $17.20 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.60 $1.97 $16.57 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $31.66 $12.69 $44.35 +81% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC UNIT INSTALLATION $17.42 $2.29 $19.71 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.55 $0.80 $14.35 -38% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $15.29 $0.00 $15.29 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $13.09 $1.28 $14.37 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.14 $1.01 $14.15 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bladen, NC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bladen

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260063-16167-bld →