Building Construction — Anson, North Carolina

WD NC20260021-16151-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 15.57 0.00 BRICKLAYER in Anson, North Carolina (construction type: building) is $19.76/hr base + $9.18/hr fringe = $28.94/hr total package (WD NC20260021-16151-bld, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: NC20260021-16151-bld
Revision: 1
Construction Type: building
State: North Carolina (NC)
County: Anson
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference NC20260021View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 15.57 0.00 BRICKLAYER $19.76 $9.18 $28.94 +26% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.41 $0.00 $16.41 -28% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $13.83 $0.00 $13.83 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ON SMOKESTACKS WHERE ELECTRICAL WORK PERFORMED IS ABOVE 40 FT. FROM THE GROUND: $0.50 PER HOUR ADDITIONAL. WORK FROM SWINGING SCAFFOLDS, B $32.31 $13.66 $45.97 +77% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.09 $0.00 $14.09 Above median $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $17.36 $2.23 $19.59 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $29.75 $18.00 $47.75 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.88 $2.15 $14.03 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $9.13 $0.28 $9.41 Above median -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE $12.00 $0.00 $12.00 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.35 $2.80 $16.15 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.00 $2.48 $18.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.00 $1.87 $17.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.77 $4.48 $24.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $13.86 $0.00 $13.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.72 $1.49 $17.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.17 $0.25 $16.42 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.13 $2.88 $17.01 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $31.66 $12.69 $44.35 Bottom 10% +81% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $12.50 $0.81 $13.31 -42% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.96 1.01 SHEET METAL WORKER $17.32 $1.56 $18.88 -25% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $15.52 $0.00 $15.52 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Anson, NC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Anson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260021-16151-bld →