Residential Construction — Alexander, North Carolina

WD NC20260111-16150-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Alexander, North Carolina (construction type: residential) is $18.62/hr base + $0.00/hr fringe = $18.62/hr total package (WD NC20260111-16150-res, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: NC20260111-16150-res
Revision: 1
Construction Type: residential
State: North Carolina (NC)
County: Alexander
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference NC20260111View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.62 $0.00 $18.62 -20% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.13 $0.57 $17.70 -23% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.24 $0.00 $15.24 -33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.88 $2.16 $21.04 -19% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $17.25 $1.67 $18.92 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.71 $0.00 $15.71 -35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.89 $0.00 $16.89 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.86 $0.00 $10.86 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.22 $0.00 $13.22 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.30 $0.00 $13.30 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.68 $0.00 $13.68 -33% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.52 $0.00 $17.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.50 $1.56 $20.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.83 $0.00 $16.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.83 $0.00 $15.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.13 $0.00 $15.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.45 $0.00 $17.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.55 $0.00 $13.55 $0.00 $0.00 $0.00 $0.00
PAINTER $13.00 $0.00 $13.00 -38% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $14.06 $0.00 $14.06 Bottom 10% -33% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $18.02 $0.00 $18.02 -27% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.00 $0.00 $15.00 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $16.75 $0.00 $16.75 Bottom 10% -33% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.93 $0.00 $14.93 -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $14.77 $0.00 $14.77 Above median -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Alexander, NC — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Alexander

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NC20260111-16150-res →