Building Construction — Tioga, New York
WD NY20260045-16126-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER in Tioga, New York (construction type: building) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260045-16126-bld, Rev. 2).
Scroll down for all 79 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS/INSULATOR WORKER | $43.25 | $27.29 | $70.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.34 | $27.66 | $71.00 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $34.44 | $20.38 | $54.82 Above median +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $34.34 | $28.46 | $62.80 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRU | $34.34 | $28.46 | $62.80 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $50.43 | $33.29 | $83.72 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED | $31.69 | $21.92 | $53.61 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $38.63 | $25.05 | $63.68 Above median +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (BINGHAMTON CHAPTER TIOGA COUNTY) | $38.63 | $25.05 | $63.68 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS: HEAVY & HIGHWAY CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY) | $38.63 | $25.05 | $63.68 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.40 | $31.72 | $75.12 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $44.50 | $31.89 | $76.39 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.68 | $33.06 | $75.74 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $42.29 | $30.66 | $72.95 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $52.86 | $35.60 | $88.46 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $47.57 | $31.03 | $78.60 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $31.72 | $29.87 | $61.59 Bottom 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $58.44 | $38.44 | $96.88 Above median +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| EMPLOYEE IS EMPLOYED DAY BEFORE AND DAY AFTER THE HOLIDAY | $39.52 | $27.16 | $66.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $30.00 | $31.95 | $61.95 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $38.50 | $25.04 | $63.54 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.16 | $30.68 | $67.84 Above median +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIA | $35.56 | $25.60 | $61.16 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; M | $36.16 | $25.60 | $61.76 +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR DRILL MACHINE OPERATORS; ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN REMAINDER OF COUNTY FOOTNOT | $35.96 | $25.60 | $61.56 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DA | $35.76 | $25.60 | $61.36 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE | $38.76 | $25.60 | $64.36 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BASIC LABORER TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL | $26.50 | $22.46 | $48.96 +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 MASONARY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTO | $28.50 | $22.46 | $50.96 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 ASBESTOS ABATEMENT AND HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOO | $28.50 | $22.46 | $50.96 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER | $35.76 | $25.60 | $61.36 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN TOWNSHIPS OF RICHFO | $35.96 | $25.60 | $61.56 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 4: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIO | $36.16 | $25.60 | $61.76 +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 5: HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOT | $38.76 | $25.60 | $64.36 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY) | $34.34 | $28.46 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED | $31.69 | $21.92 | $53.61 +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $30.00 | $23.83 | $53.83 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $29.93 | $23.83 | $53.76 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $29.60 | $23.83 | $53.43 Above median +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $29.10 | $23.83 | $52.93 Above median +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: (STRUCTURAL STEEL SPRAY WORK).$ 29.10 23.83 PAINTERS: (SPRAY WORK/STEEPLE JACK) | $29.50 | $23.83 | $53.33 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, INCLUDING STEAMFITTING | $44.91 | $33.31 | $78.22 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK | $35.51 | $24.57 | $60.08 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS, GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRAC | $49.31 | $32.80 | $82.11 +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD RO | $48.85 | $32.80 | $81.65 +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VI | $46.54 | $32.80 | $79.34 +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO | $57.30 | $33.55 | $90.85 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY | $56.39 | $33.55 | $89.94 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | $33.55 | $87.37 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA | $63.30 | $33.55 | $96.85 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN | $61.80 | $33.55 | $95.35 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA | $60.30 | $33.55 | $93.85 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING | $58.91 | $33.55 | $92.46 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR | $51.71 | $32.80 | $84.51 Above median +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.50 | $19.84 | $50.34 Above median +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.94 | $20.89 | $56.83 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY. LABORERS: HEAVY AND HIGHWAY GROUP 1: COMMON LABORERS, FLAGGERS TOWNSHIPS OF RICHFORD, BERKSHIRE, N | $35.56 | $25.60 | $61.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 1 FLAT BED TRUCK; DUMP TRUCKS; STAKE BODY TRUCK; DUMPSTER FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE D | $25.96 | $15.91 | $41.87 +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 2 DUMP TRUCK; TRANSIT MIX; TRANSIT MIX; FLAT OR STAKE BODY; A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TR | $26.03 | $15.91 | $41.94 +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS; STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY | $26.52 | $15.91 | $42.43 +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Tioga, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Tioga
Compliance Notes
- This wage determination applies to federal contracts for building construction in Tioga, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.