Building Construction — Tioga, New York

WD NY20260045-16126-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER in Tioga, New York (construction type: building) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260045-16126-bld, Rev. 2).

Scroll down for all 79 trade classifications covered by this determination.

WD Number: NY20260045-16126-bld
Revision: 2
Construction Type: building
State: New York (NY)
County: Tioga
Effective: May 17, 2026
Trades covered: 79
Official source: SAM.gov reference NY20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS/INSULATOR WORKER $43.25 $27.29 $70.54 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.34 $27.66 $71.00 +97% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.44 $20.38 $54.82 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.34 $28.46 $62.80 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRU $34.34 $28.46 $62.80 +68% vs market $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $50.43 $33.29 $83.72 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED $31.69 $21.92 $53.61 +75% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $38.63 $25.05 $63.68 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (BINGHAMTON CHAPTER TIOGA COUNTY) $38.63 $25.05 $63.68 +110% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASONS: HEAVY & HIGHWAY CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY) $38.63 $25.05 $63.68 +110% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.40 $31.72 $75.12 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.50 $31.89 $76.39 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.68 $33.06 $75.74 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $58.44 $38.44 $96.88 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
EMPLOYEE IS EMPLOYED DAY BEFORE AND DAY AFTER THE HOLIDAY $39.52 $27.16 $66.68 $0.00 $0.00 $0.00 $0.00
GLAZIER $30.00 $31.95 $61.95 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $38.50 $25.04 $63.54 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.16 $30.68 $67.84 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIA $35.56 $25.60 $61.16 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; M $36.16 $25.60 $61.76 +123% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR DRILL MACHINE OPERATORS; ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN REMAINDER OF COUNTY FOOTNOT $35.96 $25.60 $61.56 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DA $35.76 $25.60 $61.36 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE $38.76 $25.60 $64.36 +132% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BASIC LABORER TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL $26.50 $22.46 $48.96 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 MASONARY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTO $28.50 $22.46 $50.96 +84% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 ASBESTOS ABATEMENT AND HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOO $28.50 $22.46 $50.96 +84% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER $35.76 $25.60 $61.36 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN TOWNSHIPS OF RICHFO $35.96 $25.60 $61.56 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY GROUP 4: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIO $36.16 $25.60 $61.76 +123% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY AND HIGHWAY GROUP 5: HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOT $38.76 $25.60 $64.36 +132% vs market $0.00 $0.00 $0.00 $0.00
MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY) $34.34 $28.46 $62.80 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED $31.69 $21.92 $53.61 +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $30.00 $23.83 $53.83 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $29.93 $23.83 $53.76 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $29.60 $23.83 $53.43 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $29.10 $23.83 $52.93 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: (STRUCTURAL STEEL SPRAY WORK).$ 29.10 23.83 PAINTERS: (SPRAY WORK/STEEPLE JACK) $29.50 $23.83 $53.33 +98% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDING STEAMFITTING $44.91 $33.31 $78.22 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK $35.51 $24.57 $60.08 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS, GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRAC $49.31 $32.80 $82.11 +113% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD RO $48.85 $32.80 $81.65 +112% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VI $46.54 $32.80 $79.34 +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO $57.30 $33.55 $90.85 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY $56.39 $33.55 $89.94 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $53.82 $33.55 $87.37 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA $63.30 $33.55 $96.85 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN $61.80 $33.55 $95.35 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA $60.30 $33.55 $93.85 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $58.91 $33.55 $92.46 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR $51.71 $32.80 $84.51 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.50 $19.84 $50.34 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.94 $20.89 $56.83 +61% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $47.85 $28.94 $76.79 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY. LABORERS: HEAVY AND HIGHWAY GROUP 1: COMMON LABORERS, FLAGGERS TOWNSHIPS OF RICHFORD, BERKSHIRE, N $35.56 $25.60 $61.16 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 FLAT BED TRUCK; DUMP TRUCKS; STAKE BODY TRUCK; DUMPSTER FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE D $25.96 $15.91 $41.87 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 DUMP TRUCK; TRANSIT MIX; TRANSIT MIX; FLAT OR STAKE BODY; A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TR $26.03 $15.91 $41.94 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS; STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY $26.52 $15.91 $42.43 +46% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Tioga, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.