Building Construction — Suffolk, New York

WD NY20260012-16085-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 BOOM LENGTHS in Suffolk, New York (construction type: building) is $84.70/hr base + $40.15/hr fringe = $124.85/hr total package (WD NY20260012-16085-bld, Rev. 2).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: NY20260012-16085-bld
Revision: 2
Construction Type: building
State: New York (NY)
County: Suffolk
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference NY20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 BOOM LENGTHS $84.70 $40.15 $124.85 $0.00 $0.00 $0.00 $0.00
1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHIN $54.21 $39.99 $94.20 $0.00 $0.00 $0.00 $0.00
1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 $76.61 $40.15 $116.76 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $71.76 $36.81 $108.57 Top 10% +256% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN $68.88 $49.83 $118.71 Top 10% +229% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $67.39 $35.90 $103.29 Top 10% +177% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $59.05 $48.08 $107.13 Top 10% +250% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $34.14 $23.15 $57.29 +87% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $53.56 $34.28 $87.84 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $60.59 $55.84 $116.43 Top 10% +280% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $55.00 $55.84 $110.84 Top 10% +262% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $55.59 $55.41 $111.00 Top 10% +263% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS $75.46 $55.84 $131.30 Top 10% +329% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: NASSAU COUNTY AND SUFFOLK COUNTY $53.56 $34.28 $87.84 +187% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $59.87 $41.81 $101.68 Top 10% +236% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $64.55 $47.40 $111.95 Top 10% +201% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $42.93 $32.43 $75.36 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $49.79 $32.27 $82.06 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V $59.09 $45.56 $104.65 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V $75.14 $47.45 $122.59 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $47.75 $13.70 $61.45 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $57.00 $32.96 $89.96 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $60.40 $60.14 $120.54 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $48.15 $67.62 $115.77 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $58.95 $92.02 $150.97 Top 10% +229% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $42.55 $34.79 $77.34 Top 10% +179% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: ASBESTOS; LEAD; & HAZARDOUS WASTE LABORERS $41.15 $20.90 $62.05 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PLASTERERS TENDERS $42.55 $34.79 $77.34 +179% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: REGULAR LABORERS A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT $45.49 $35.98 $81.47 +194% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL D $42.34 $30.05 $72.39 +28% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILRO $56.46 $34.63 $91.09 +61% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROA $70.57 $39.19 $109.76 +94% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: MATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICA $61.40 $36.24 $97.64 +73% vs market $0.00 $0.00 $0.00 $0.00
LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 BOOM LENGTHS 350 FT 3.00 CRANES USING CLAMS $44.37 $12.95 $57.32 $0.00 $0.00 $0.00 $0.00
MASON - STONE $69.91 $44.02 $113.93 Top 10% +330% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $60.83 $58.03 $118.86 Top 10% +214% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $47.75 $44.11 $91.86 Top 10% +241% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.75 $44.11 $88.86 Top 10% +230% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $49.20 $57.20 $106.40 Top 10% +295% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $56.25 $55.14 $111.39 Top 10% +314% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $48.47 $35.91 $84.38 Top 10% +213% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $48.51 $32.78 $81.29 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $36.05 $19.63 $55.68 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $60.73 $45.75 $106.48 Top 10% +182% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, SERVICE FITTERS $47.85 $23.96 $71.81 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER, CHERRY PICKER, OVER 50 T $80.43 $39.99 $120.42 +212% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR, DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE $76.44 $39.99 $116.43 +202% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR, DINKY LOCOMOTIVE, FORKLIFT, HOIST, LO $79.33 $40.15 $119.48 +210% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREM $73.78 $39.99 $113.77 +195% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR, COMPRESSOR, CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT, GENER $58.93 $40.15 $99.08 +157% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 COMPRESSOR, COMPRESSOR, COMPRESSOR, COMPRESSOR, CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT, GENERATOR-PILE $56.54 $39.99 $96.53 +150% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 BATCHING PLANT, GENERATOR, GRINDER, MIXER, MIXER, MIXER, MULCH MACHINE, OILER, PUMP, ROOT CUTTER, STUMP CHIPPER, TO $56.55 $40.15 $96.70 +151% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $51.25 $47.36 $98.61 Top 10% +224% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.79 $25.37 $61.16 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $53.60 $60.74 $114.34 Top 10% +224% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETE $45.65 $56.20 $101.85 +250% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Suffolk, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Suffolk

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260012-16085-bld →