Highway Construction — Steuben, New York

WD NY20260018-16112-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ELECTRICIAN in Steuben, New York (construction type: highway) is $43.40/hr base + $31.72/hr fringe = $75.12/hr total package (WD NY20260018-16112-hwy, Rev. 1).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: NY20260018-16112-hwy
Revision: 1
Construction Type: highway
State: New York (NY)
County: Steuben
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference NY20260018View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ELECTRICIAN $43.40 $31.72 $75.12 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTOR $34.06 $30.80 $64.86 Bottom 10% +41% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: IRONWORKER $35.49 $32.30 $67.79 +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR $35.75 $30.80 $66.55 +45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: SHEETER $36.00 $30.80 $66.80 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.02 $2.12 $13.14 -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GROUP 1 LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACH $35.26 $23.85 $59.11 +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GROUP 2 ALL ROCK OR DRILL MACHINE OPERATORS; ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; BLASTERS; FORM SETTERS; STONE OR GRANITE CUR $35.46 $23.85 $59.31 +114% vs market $0.00 $0.00 $0.00 $0.00
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE W $58.38 $35.75 $94.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY $41.26 $34.85 $76.11 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY DRILL $54.68 $35.75 $90.43 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR $57.21 $35.00 $92.21 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3: ""A"" FRAME TRUCK; BALLAST REGULATOR; COMPRESSORS; COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS $54.42 $35.00 $89.42 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3: A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALLAST $51.81 $35.75 $87.56 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4: CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL D $51.41 $35.00 $86.41 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRIST $61.38 $35.75 $97.13 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 7 MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH $56.81 $35.75 $92.56 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $60.84 $35.00 $95.84 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $43.26 $34.85 $78.11 Bottom 10% +102% vs market $0.00 $0.00 $0.00 $0.00
OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL $58.43 $35.00 $93.43 Top 10% $0.00 $0.00 $0.00 $0.00
OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL $55.38 $35.75 $91.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY B $59.88 $35.75 $95.63 Top 10% $0.00 $0.00 $0.00 $0.00
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS; FRONT END LOADER; HI- PRESSURE BOILER; HOIST; KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTE $40.79 $34.85 $75.64 Top 10% $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK $35.51 $24.57 $60.08 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW YE $40.10 $34.85 $74.95 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $11.62 $3.21 $14.83 -51% vs market $0.00 $0.00 $0.00 $0.00
STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDL $36.61 $34.85 $71.46 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 FLAT BED TRUCK; DUMP TRUCKS; STAKE BODY TRUCK; DUMPSTER FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE $25.96 $15.91 $41.87 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS; SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN $35.48 $31.58 $67.06 +130% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 DUMP TRUCK; TRANSIT MIX; TRANSIT MIX; FLAT OR STAKE BODY; A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC T $26.03 $15.91 $41.94 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE CARRIER; SELF $35.83 $31.58 $67.41 +132% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS; STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY $26.52 $15.91 $42.43 +46% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Steuben, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Steuben

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260018-16112-hwy →