Building Construction — St Lawrence, New York

WD NY20260116-16099-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in St Lawrence, New York (construction type: building) is $31.97/hr base + $19.19/hr fringe = $51.16/hr total package (WD NY20260116-16099-bld, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: NY20260116-16099-bld
Revision: 1
Construction Type: building
State: New York (NY)
County: St Lawrence
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference NY20260116View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $31.97 $19.19 $51.16 +37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.68 $23.01 $53.69 +75% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION) $32.59 $23.24 $55.83 +82% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.93 $18.98 $49.91 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.50 $28.38 $71.88 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $57.73 $38.44 $96.17 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $31.44 $20.94 $52.38 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $35.49 $32.30 $67.79 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $31.44 $27.18 $58.62 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.49 $32.30 $67.79 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
LABORER $27.03 $24.00 $51.03 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $24.77 $6.75 $31.52 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $31.49 $21.54 $53.03 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $30.20 $23.83 $54.03 Bottom 10% +43% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $43.97 $24.17 $68.14 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $41.10 $19.26 $60.36 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.90 $26.78 $67.68 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $32.70 $24.12 $56.82 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $28.35 $25.21 $53.56 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $28.35 $25.21 $53.56 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $37.47 $27.40 $64.87 +72% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $37.19 $27.89 $65.08 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.41 $17.23 $46.64 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.73 $33.04 $66.77 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $38.34 $20.51 $58.85 Above median +94% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Lawrence, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Lawrence

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260116-16099-bld →