Highway Construction — Rockland, New York

WD NY20260020-16092-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVE in Rockland, New York (construction type: highway) is $62.35/hr base + $37.50/hr fringe = $99.85/hr total package (WD NY20260020-16092-hwy, Rev. 2).

Scroll down for all 85 trade classifications covered by this determination.

WD Number: NY20260020-16092-hwy
Revision: 2
Construction Type: highway
State: New York (NY)
County: Rockland
Effective: May 17, 2026
Trades covered: 85
Official source: SAM.gov reference NY20260020View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVE $62.35 $37.50 $99.85 $0.00 $0.00 $0.00 $0.00
ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION $37.91 $46.37 $84.28 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN $68.88 $49.83 $118.71 Top 10% +229% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS $47.44 $38.00 $85.44 +129% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $50.12 $31.73 $81.85 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $32.60 $20.69 $53.29 +74% vs market $0.00 $0.00 $0.00 $0.00
DIVER $75.46 $55.84 $131.30 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
DIVER TENDER $55.00 $55.84 $110.84 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
DOCK BUILDER & PILEDRIVERMEN $60.59 $55.84 $116.43 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $43.35 $30.73 $74.08 +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $54.19 $35.69 $89.88 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $48.77 $31.31 $80.08 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $32.51 $29.93 $62.44 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: BUILDING, HEAVY & HIGHWAY CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR $51.50 $42.22 $93.72 +152% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: RESIDENTIAL CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENT $51.50 $42.22 $93.72 +152% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V $59.09 $45.56 $104.65 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V $75.14 $47.45 $122.59 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $76.12 $38.98 $115.10 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $49.20 $57.20 $106.40 Top 10% +269% vs market $0.00 $0.00 $0.00 $0.00
GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES; HAMMER VIBRATORY; HOISTS, HOPPERS, HOPPERS DOORS; HYDRO-BLASTER; LADDERS; LADDERVATOR; LOCOMO $58.22 $37.50 $95.72 $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $46.62 $49.30 $95.92 Top 10% $0.00 $0.00 $0.00 $0.00
IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. POWER EQUIPMENT OPERATORS: GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS $68.37 $37.50 $105.87 $0.00 $0.00 $0.00 $0.00
IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. POWER EQUIPMENT OPERATORS: GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR; CHIEF O $58.56 $37.50 $96.06 $0.00 $0.00 $0.00 $0.00
IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. POWER EQUIPMENT OPERATORS: GROUP 4: COMPRESSOR; DOPE POTS; DUST COLLECTORS; PUMPS; PUMPS; PUMPS, DIE $57.06 $37.50 $94.56 $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER $46.62 $49.30 $95.92 Top 10% +214% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY $42.63 $53.70 $96.33 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
LABORER CATEGORY A $50.25 $28.15 $78.40 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER CATEGORY B $50.25 $28.15 $78.40 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER CATEGORY C $50.25 $28.15 $78.40 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER CATEGORY D $50.25 $28.15 $78.40 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 BLASTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESID $52.35 $28.15 $80.50 +190% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING $50.25 $28.15 $78.40 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN; SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER; W $46.10 $28.15 $74.25 +168% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 FLAG PERSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRE $42.60 $28.15 $70.75 +155% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $60.83 $58.03 $118.86 Top 10% +214% vs market $0.00 $0.00 $0.00 $0.00
OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKL $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
PAINTERS $40.14 $24.66 $64.80 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $39.14 $24.66 $63.80 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $56.25 $55.14 $111.39 Top 10% +314% vs market $0.00 $0.00 $0.00 $0.00
PIPE BENDING MACHINE OPERATOR $54.63 $50.98 $105.61 $0.00 $0.00 $0.00 $0.00
PLUMBER $41.99 $37.38 $79.37 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $53.20 $46.57 $99.77 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 ""A"" FRAME; BACKHOE; BOOM ATTACHMENT ON LOADERS NOT APPL $60.13 $37.50 $97.63 +153% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 $61.72 $37.50 $99.22 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 CRANES; DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES $70.24 $37.50 $107.74 +179% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNN $69.96 $37.50 $107.46 +178% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2: ""A"" FRAME; BACKHOE; BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE $60.70 $37.50 $98.20 +154% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC $61.29 $37.50 $98.79 +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS $64.85 $37.50 $102.35 +165% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DR $61.28 $37.50 $98.78 +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTP $57.10 $37.50 $94.60 +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL D $52.88 $37.50 $90.38 +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5: OILER NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS $54.07 $37.50 $91.57 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT $53.34 $37.50 $90.84 +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOTS NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DA $63.54 $37.50 $101.04 +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PA $53.34 $37.50 $90.84 +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS $64.28 $37.50 $101.78 +164% vs market $0.00 $0.00 $0.00 $0.00
PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGI $68.58 $37.50 $106.08 $0.00 $0.00 $0.00 $0.00
PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDA $65.74 $37.50 $103.24 $0.00 $0.00 $0.00 $0.00
PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDA $58.63 $37.50 $96.13 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $55.29 $47.43 $102.72 Top 10% +191% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $57.20 $32.66 $89.86 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PR $39.03 $46.37 $85.40 Top 10% +193% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE $37.35 $46.37 $83.72 Top 10% +188% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FU $37.13 $46.37 $83.50 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDE $37.02 $46.37 $83.39 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS. FOOTN $36.90 $46.37 $83.27 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Rockland, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Rockland

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260020-16092-hwy →