Highway Construction — Rockland, New York
WD NY20260020-16092-hwy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for 75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVE in Rockland, New York (construction type: highway) is $62.35/hr base + $37.50/hr fringe = $99.85/hr total package (WD NY20260020-16092-hwy, Rev. 2).
Scroll down for all 85 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVE | $62.35 | $37.50 | $99.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION | $37.91 | $46.37 | $84.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN | $68.88 | $49.83 | $118.71 Top 10% +229% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS | $47.44 | $38.00 | $85.44 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $50.12 | $31.73 | $81.85 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $32.60 | $20.69 | $53.29 +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $75.46 | $55.84 | $131.30 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $43.35 | $30.73 | $74.08 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $54.19 | $35.69 | $89.88 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $48.77 | $31.31 | $80.08 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $32.51 | $29.93 | $62.44 Bottom 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: BUILDING, HEAVY & HIGHWAY CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR | $51.50 | $42.22 | $93.72 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: RESIDENTIAL CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENT | $51.50 | $42.22 | $93.72 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V | $59.09 | $45.56 | $104.65 Bottom 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V | $75.14 | $47.45 | $122.59 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $76.12 | $38.98 | $115.10 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $49.20 | $57.20 | $106.40 Top 10% +269% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES; HAMMER VIBRATORY; HOISTS, HOPPERS, HOPPERS DOORS; HYDRO-BLASTER; LADDERS; LADDERVATOR; LOCOMO | $58.22 | $37.50 | $95.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $46.62 | $49.30 | $95.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. POWER EQUIPMENT OPERATORS: GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS | $68.37 | $37.50 | $105.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. POWER EQUIPMENT OPERATORS: GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR; CHIEF O | $58.56 | $37.50 | $96.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. POWER EQUIPMENT OPERATORS: GROUP 4: COMPRESSOR; DOPE POTS; DUST COLLECTORS; PUMPS; PUMPS; PUMPS, DIE | $57.06 | $37.50 | $94.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER | $46.62 | $49.30 | $95.92 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $42.63 | $53.70 | $96.33 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER CATEGORY A | $50.25 | $28.15 | $78.40 +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER CATEGORY B | $50.25 | $28.15 | $78.40 +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER CATEGORY C | $50.25 | $28.15 | $78.40 +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER CATEGORY D | $50.25 | $28.15 | $78.40 +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 BLASTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESID | $52.35 | $28.15 | $80.50 +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING | $50.25 | $28.15 | $78.40 +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN; SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER; W | $46.10 | $28.15 | $74.25 +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 FLAG PERSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRE | $42.60 | $28.15 | $70.75 +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKL | $56.59 | $37.50 | $94.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $40.14 | $24.66 | $64.80 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $39.14 | $24.66 | $63.80 Above median +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $56.25 | $55.14 | $111.39 Top 10% +314% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPE BENDING MACHINE OPERATOR | $54.63 | $50.98 | $105.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.99 | $37.38 | $79.37 Above median +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $53.20 | $46.57 | $99.77 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 ""A"" FRAME; BACKHOE; BOOM ATTACHMENT ON LOADERS NOT APPL | $60.13 | $37.50 | $97.63 +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 | $61.72 | $37.50 | $99.22 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANES; DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES | $70.24 | $37.50 | $107.74 +179% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNN | $69.96 | $37.50 | $107.46 +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2: ""A"" FRAME; BACKHOE; BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE | $60.70 | $37.50 | $98.20 +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC | $61.29 | $37.50 | $98.79 +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS | $64.85 | $37.50 | $102.35 +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DR | $61.28 | $37.50 | $98.78 +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTP | $57.10 | $37.50 | $94.60 +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL D | $52.88 | $37.50 | $90.38 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5: OILER NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS | $54.07 | $37.50 | $91.57 +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT | $53.34 | $37.50 | $90.84 +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOTS NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DA | $63.54 | $37.50 | $101.04 +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PA | $53.34 | $37.50 | $90.84 +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS | $64.28 | $37.50 | $101.78 +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGI | $68.58 | $37.50 | $106.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDA | $65.74 | $37.50 | $103.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDA | $58.63 | $37.50 | $96.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 Top 10% +191% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PR | $39.03 | $46.37 | $85.40 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE | $37.35 | $46.37 | $83.72 Top 10% +188% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FU | $37.13 | $46.37 | $83.50 Top 10% +187% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDE | $37.02 | $46.37 | $83.39 Top 10% +187% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS. FOOTN | $36.90 | $46.37 | $83.27 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Rockland, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Rockland
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Rockland, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.