Highway Construction — Richmond, New York
WD NY20260003-16091-hwy · Revision 3 · Effective May 20, 2026
The Davis-Bacon prevailing wage for 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY in Richmond, New York (construction type: highway) is $74.65/hr base + $38.00/hr fringe = $112.65/hr total package (WD NY20260003-16091-hwy, Rev. 3).
Scroll down for all 107 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY | $74.65 | $38.00 | $112.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; EL | $97.75 | $38.95 | $136.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR | $71.76 | $36.81 | $108.57 Top 10% +256% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN | $68.88 | $49.83 | $118.71 Top 10% +229% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 Top 10% +177% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $52.32 | $36.25 | $88.57 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, BUILDING & RESIDENTIAL | $59.05 | $48.08 | $107.13 Top 10% +250% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: HEAVY & HIGHWAY | $61.59 | $55.84 | $117.43 Top 10% +284% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $55.59 | $55.41 | $111.00 Top 10% +263% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $59.05 | $48.08 | $107.13 Top 10% +250% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | $101.68 Top 10% +236% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY | $72.40 | $38.00 | $110.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY | $100.18 | $38.95 | $139.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $75.46 | $55.84 | $131.30 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COL | $62.00 | $65.81 | $127.81 Top 10% +243% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COL | $32.00 | $27.16 | $59.16 Bottom 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V | $75.14 | $47.45 | $122.59 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V | $59.09 | $45.56 | $104.65 Bottom 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $49.20 | $57.20 | $106.40 Top 10% +269% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $57.00 | $32.96 | $89.96 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $60.40 | $60.14 | $120.54 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $48.15 | $67.62 | $115.77 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS | $58.95 | $92.02 | $150.97 Top 10% +229% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $49.28 | $27.05 | $76.33 Top 10% +175% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL/CEMENT/CONCRETE | $44.50 | $52.08 | $96.58 Top 10% +248% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY | $44.35 | $52.08 | $96.43 Top 10% +248% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS | $29.29 | $20.29 | $49.58 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS Tier A | $40.22 | $25.17 | $65.39 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS-ASPHALT CONSTRUCTION | $50.80 | $54.05 | $104.85 Top 10% +278% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS-ASPHALT CONSTRUCTION | $50.20 | $54.05 | $104.25 Bottom 10% +276% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS-ASPHALT CONSTRUCTION: (SHOVELER) | $46.33 | $54.05 | $100.38 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS-ASPHALT CONSTRUCTION: (SMALL EQUIPMENT OPERATOR) | $46.33 | $54.05 | $100.38 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: ASBESTOS; LEAD; & HAZARDOUS WASTE LABORERS | $41.15 | $20.90 | $62.05 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: FENCE INSTALLER & REPAIRER FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: FORMSETTERS FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED | $50.80 | $54.04 | $104.84 Top 10% +278% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: FREE AIR & TUNNEL MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN | $64.08 | $54.00 | $118.08 Top 10% +326% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY | $57.71 | $52.08 | $109.79 Top 10% +296% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY | $51.85 | $52.08 | $103.93 Above median +275% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY | $44.50 | $52.08 | $96.58 Bottom 10% +248% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY (BLASTERS) | $51.85 | $52.08 | $103.93 Top 10% +275% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: LABORERS FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: LANDSCAPE PLANTING & MAINTENANCE FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKS | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: MAINTENANCE SAFETY SURFACE FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: SLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: SMALL EQUIPMENT OPERATOR FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING D | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: SMALL POWER TOOLS OPERATOR FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING | $46.33 | $54.04 | $100.37 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY | $44.50 | $52.08 | $96.58 Top 10% +248% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION | $42.34 | $30.05 | $72.39 Bottom 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION | $70.57 | $39.19 | $109.76 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $49.99 | $37.54 | $87.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASON | $63.92 | $40.20 | $104.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $69.91 | $44.02 | $113.93 Top 10% +330% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRIST | $68.62 | $38.00 | $106.62 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $44.75 | $44.11 | $88.86 Top 10% +230% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $47.75 | $44.11 | $91.86 Top 10% +241% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $56.25 | $55.14 | $111.39 Top 10% +314% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $48.47 | $35.91 | $84.38 Top 10% +213% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $48.51 | $32.78 | $81.29 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $73.00 | $32.81 | $105.81 Top 10% +181% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, SERVICE FITTERS | $47.85 | $23.96 | $71.81 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POINTER, CLEANER AND CAULKER | $63.69 | $32.42 | $96.11 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 DOUBLE DRUM FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY | $92.32 | $38.95 | $131.27 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 OILER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETE | $65.94 | $32.95 | $98.89 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS FOOTNOTE: A. PAID HOLIDAYS: NEW | $63.98 | $32.95 | $96.93 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 STONE DERRICK, CRANES, HYDRAULIC CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM | $97.79 | $38.95 | $136.74 Top 10% +254% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 4 POLE HOIST, SINGLE DRUM HOISTS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPE | $79.70 | $38.95 | $118.65 Top 10% +207% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO MEN ONLY, DRIVING TRUCK CRANES FOOTNO | $57.42 | $32.95 | $90.37 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 FORK LIFT, HOUSE CARS, PLASTER, PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL FOOT | $72.46 | $38.95 | $111.41 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 OILERS FOR THE FOLLOWING EQUIPMENT: GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT MANNED BY TWO-MEN PREMIUMS FOR | $64.82 | $38.00 | $102.82 Top 10% +166% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 COMPRESSORS, WELDING MACHINES, PAINT SPRAYING, SAND BLASTING, PUMPS, HOUSE CAR, ALL ENGINES IRRESPECTIVE OF POWER USE | $54.12 | $38.95 | $93.07 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 OILERS FOR THE FOLLOWING EQUIPMENT: SHOVELS, CRANES, BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSO | $44.45 | $38.00 | $82.45 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES: 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349 | $117.60 | $38.95 | $156.55 Top 10% +306% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 10 CONCRETE MIXERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTH | $85.21 | $38.95 | $124.16 Top 10% +222% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 11 ELEVATORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; M | $79.62 | $38.95 | $118.57 Top 10% +207% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS, LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 FOOTNOTE: A. PAID | $81.38 | $38.95 | $120.33 Top 10% +212% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 13 VIBRATORY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; M | $81.97 | $38.95 | $120.92 Top 10% +213% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS, TUGGER MACHINE, WELL POINT PUMPS, CHUM DRILL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S D | $61.87 | $38.95 | $100.82 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS, PUMPS (RIVER COFFERDAM AND WELDING MACHINES PUSH BUTTON MACH | $57.52 | $38.95 | $96.47 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2 RUBBER TIRE BACKHOES OVER 37,000 LBS, TRACK BACKHOES, POWER SHOVEL, HYDRAULIC CLAM SHELLS, MOLES AN | $97.06 | $38.95 | $136.01 Top 10% +252% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5 PILEDRIVERS, DERRICK BOATS, TUNNEL SHOVELS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BI | $95.83 | $38.95 | $134.78 Top 10% +249% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 6 ALL DRILLS, AND MACHINES OF A SIMILAR NATURE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S | $92.01 | $38.95 | $130.96 Top 10% +239% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES: 100' TO 149' B | $93.74 | $38.95 | $132.69 Top 10% +244% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS, CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE, CONCRETE PUMPS FOOTNOTE: A. PAID HO | $91.04 | $38.95 | $129.99 Top 10% +237% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE FOOTNOTE: A | $88.72 | $38.95 | $127.67 Top 10% +231% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT PLANTS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHD | $75.01 | $38.95 | $113.96 Top 10% +195% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT ROLLER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHD | $88.72 | $38.95 | $127.67 Top 10% +231% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT SPREADER | $91.04 | $38.95 | $129.99 Top 10% +237% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: COMPRESSORS, WELDING MACHINES | $56.34 | $36.95 | $93.29 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS | $96.26 | $36.95 | $133.21 Top 10% +245% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: THREE DRUM DERRICKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; M | $100.14 | $36.95 | $137.09 Top 10% +255% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: UTILITY: HORIZONTAL BORING RIG FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORI | $86.61 | $38.95 | $125.56 Top 10% +225% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: UTILITY: OFF SHIFT COMPRESSORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORI | $71.98 | $38.95 | $110.93 Top 10% +187% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: UTILITY: UTILITY COMPRESSORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL | $57.14 | $38.95 | $96.09 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $50.25 | $32.62 | $82.87 Top 10% +172% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $53.60 | $60.74 | $114.34 Top 10% +224% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.79 | $25.37 | $61.16 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $49.59 | $34.25 | $83.84 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | $102.25 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $49.59 | $34.25 | $83.84 Top 10% +176% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $64.40 | $37.13 | $101.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER EUCLIDS & TURNAPULLS FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY | $49.38 | $57.65 | $107.03 Top 10% +268% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: ASPHALT FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY | $46.12 | $59.65 | $105.77 Top 10% +263% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: HIGH RISE FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION D | $65.43 | $53.15 | $118.58 Top 10% +307% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Richmond, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Richmond
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Richmond, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.