Heavy Construction — Putnam, New York
WD NY20260025-16089-hvy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN in Putnam, New York (construction type: heavy) is $68.88/hr base + $49.83/hr fringe = $118.71/hr total package (WD NY20260025-16089-hvy, Rev. 2).
Scroll down for all 94 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN | $68.88 | $49.83 | $118.71 Top 10% +229% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $52.32 | $36.25 | $88.57 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS | $46.39 | $37.45 | $83.84 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $44.69 | $38.17 | $82.86 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $50.12 | $31.73 | $81.85 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $75.46 | $55.84 | $131.30 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S | $51.50 | $42.22 | $93.72 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $43.35 | $30.73 | $74.08 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $54.19 | $35.69 | $89.88 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $48.77 | $31.31 | $80.08 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $32.51 | $29.93 | $62.44 Bottom 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $76.12 | $38.98 | $115.10 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $46.62 | $49.30 | $95.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER | $46.62 | $49.30 | $95.92 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $42.63 | $53.70 | $96.33 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $44.05 | $32.40 | $76.45 Top 10% +176% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 1 BLASTERS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, I | $52.11 | $28.98 | $81.09 +192% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 2 BURNER, JUMBO DRILLER, JOY DRILLER, WAGON DRILLER, AIR TRACK DRILLER, HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE FORM | $50.71 | $28.98 | $79.69 +187% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES | $50.29 | $28.98 | $79.27 +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER | $49.93 | $28.98 | $78.91 +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 5 COMMON LABORERS, SIGNAL PERSON AND PIT PERSON , TRUCK SPOTTERS, POWDER PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON. FOO | $49.56 | $28.98 | $78.54 +183% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 6 FLAGPERSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY | $42.96 | $28.98 | $71.94 +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY: GROUP 7 ASBESTOS AND TOXIC WASTE LABORER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD | $51.64 | $28.98 | $80.62 +191% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HIGHWAY: GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE T | $36.45 | $27.80 | $64.25 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HIGHWAY: GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, POWDERMAN, H | $42.80 | $27.80 | $70.60 +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HIGHWAY: GROUP 3 ASPHALT RAKER, ASPHALT SCREEMAN, DRILLERS, LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS, LEAD MAN, TUNNEL & CAISSON | $43.90 | $27.80 | $71.70 +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $49.99 | $37.54 | $87.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASON | $63.92 | $40.20 | $104.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $48.63 | $38.93 | $87.56 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $50.26 | $38.93 | $89.19 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $50.51 | $38.93 | $89.44 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $49.88 | $38.93 | $88.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $50.38 | $38.93 | $89.31 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $50.01 | $38.93 | $88.94 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $49.26 | $38.93 | $88.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $49.13 | $38.93 | $88.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $48.96 | $38.93 | $87.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $48.51 | $38.93 | $87.44 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND | $51.26 | $38.93 | $90.19 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $47.75 | $44.11 | $91.86 Top 10% +241% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $44.75 | $44.11 | $88.86 Top 10% +230% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $49.20 | $57.20 | $106.40 Top 10% +295% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $65.07 | $45.35 | $110.42 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POINTER, CLEANER AND CAULKER | $41.96 | $33.38 | $75.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3-A ASPHALT PLANT; BOILER; CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT; JOY DRILL OR SIMILAR T | $54.41 | $31.32 | $85.73 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3-B COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT; WELDING MACHINE; AND COMPR | $52.25 | $31.32 | $83.57 +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4-A AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM T | $54.33 | $31.32 | $85.65 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 MOTORIZED ROLLER NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPE | $45.94 | $31.32 | $77.26 +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT | $64.02 | $35.25 | $99.27 +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5-A MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OP | $61.95 | $31.32 | $93.27 +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5-B UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPERAT | $47.00 | $31.32 | $78.32 +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPERAT | $49.26 | $31.32 | $80.58 +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR; COMPRESSOR TRUCK MOUNTED NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RAT | $44.19 | $35.25 | $79.44 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $50.25 | $32.62 | $82.87 Top 10% +172% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 Top 10% +191% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILA | $56.81 | $35.25 | $92.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $49.59 | $34.25 | $83.84 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | $102.25 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY | $70.41 | $35.25 | $105.66 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY | $51.57 | $35.25 | $86.82 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY | $57.84 | $35.25 | $93.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY | $68.63 | $35.25 | $103.88 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $49.59 | $34.25 | $83.84 Top 10% +176% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $64.40 | $37.13 | $101.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TON UP TO 25 TON) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPERATORS 3.00 LOADER OPERATORS .50 S | $59.04 | $31.32 | $90.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $59.19 | $35.25 | $94.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $75.13 | $35.25 | $110.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $77.82 | $35.25 | $113.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $64.02 | $35.25 | $99.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $59.67 | $35.25 | $94.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $63.70 | $35.25 | $98.95 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $60.42 | $35.25 | $95.67 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Putnam, NY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Putnam
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Putnam, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.