Heavy Construction — Putnam, New York

WD NY20260025-16089-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN in Putnam, New York (construction type: heavy) is $68.88/hr base + $49.83/hr fringe = $118.71/hr total package (WD NY20260025-16089-hvy, Rev. 2).

Scroll down for all 94 trade classifications covered by this determination.

WD Number: NY20260025-16089-hvy
Revision: 2
Construction Type: heavy
State: New York (NY)
County: Putnam
Effective: May 17, 2026
Trades covered: 94
Official source: SAM.gov reference NY20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN $68.88 $49.83 $118.71 Top 10% +229% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $52.32 $36.25 $88.57 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS $46.39 $37.45 $83.84 +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.69 $38.17 $82.86 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $50.12 $31.73 $81.85 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
DIVER $75.46 $55.84 $131.30 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
DIVER TENDER $55.00 $55.84 $110.84 Top 10% +50% vs market $0.00 $0.00 $0.00 $0.00
DOCK BUILDER & PILEDRIVERMEN $60.59 $55.84 $116.43 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S $51.50 $42.22 $93.72 +152% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $43.35 $30.73 $74.08 +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $54.19 $35.69 $89.88 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $48.77 $31.31 $80.08 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF $32.51 $29.93 $62.44 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $76.12 $38.98 $115.10 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $46.62 $49.30 $95.92 Top 10% $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER $46.62 $49.30 $95.92 Top 10% +214% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY $42.63 $53.70 $96.33 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
LABORER $44.05 $32.40 $76.45 Top 10% +176% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 1 BLASTERS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, I $52.11 $28.98 $81.09 +192% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 2 BURNER, JUMBO DRILLER, JOY DRILLER, WAGON DRILLER, AIR TRACK DRILLER, HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE FORM $50.71 $28.98 $79.69 +187% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES $50.29 $28.98 $79.27 +186% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER $49.93 $28.98 $78.91 +185% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 5 COMMON LABORERS, SIGNAL PERSON AND PIT PERSON , TRUCK SPOTTERS, POWDER PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON. FOO $49.56 $28.98 $78.54 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 6 FLAGPERSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY $42.96 $28.98 $71.94 +159% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY: GROUP 7 ASBESTOS AND TOXIC WASTE LABORER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD $51.64 $28.98 $80.62 +191% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY: GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE T $36.45 $27.80 $64.25 +132% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY: GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, POWDERMAN, H $42.80 $27.80 $70.60 +155% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY: GROUP 3 ASPHALT RAKER, ASPHALT SCREEMAN, DRILLERS, LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS, LEAD MAN, TUNNEL & CAISSON $43.90 $27.80 $71.70 +159% vs market $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $49.99 $37.54 $87.53 Top 10% $0.00 $0.00 $0.00 $0.00
MARBLE MASON $63.92 $40.20 $104.12 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $60.83 $58.03 $118.86 Top 10% +214% vs market $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $48.63 $38.93 $87.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $50.26 $38.93 $89.19 Above median $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $50.51 $38.93 $89.44 Top 10% $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $49.88 $38.93 $88.81 Above median $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $50.38 $38.93 $89.31 Above median $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $50.01 $38.93 $88.94 Above median $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $49.26 $38.93 $88.19 $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $49.13 $38.93 $88.06 $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $48.96 $38.93 $87.89 $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $48.51 $38.93 $87.44 Bottom 10% $0.00 $0.00 $0.00 $0.00
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND $51.26 $38.93 $90.19 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $47.75 $44.11 $91.86 Top 10% +241% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.75 $44.11 $88.86 Top 10% +230% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $49.20 $57.20 $106.40 Top 10% +295% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $65.07 $45.35 $110.42 Top 10% +193% vs market $0.00 $0.00 $0.00 $0.00
POINTER, CLEANER AND CAULKER $41.96 $33.38 $75.34 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3-A ASPHALT PLANT; BOILER; CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT; JOY DRILL OR SIMILAR T $54.41 $31.32 $85.73 +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3-B COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT; WELDING MACHINE; AND COMPR $52.25 $31.32 $83.57 +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4-A AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM T $54.33 $31.32 $85.65 +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 MOTORIZED ROLLER NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPE $45.94 $31.32 $77.26 +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT $64.02 $35.25 $99.27 +157% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5-A MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OP $61.95 $31.32 $93.27 +142% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5-B UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPERAT $47.00 $31.32 $78.32 +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPERAT $49.26 $31.32 $80.58 +109% vs market $0.00 $0.00 $0.00 $0.00
PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR; COMPRESSOR TRUCK MOUNTED NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RAT $44.19 $35.25 $79.44 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $50.25 $32.62 $82.87 Top 10% +172% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $55.29 $47.43 $102.72 Top 10% +191% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $57.20 $32.66 $89.86 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILA $56.81 $35.25 $92.06 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $49.59 $34.25 $83.84 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $64.62 $37.63 $102.25 Top 10% +193% vs market $0.00 $0.00 $0.00 $0.00
THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY $70.41 $35.25 $105.66 Top 10% $0.00 $0.00 $0.00 $0.00
THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY $51.57 $35.25 $86.82 Bottom 10% $0.00 $0.00 $0.00 $0.00
THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY $57.84 $35.25 $93.09 $0.00 $0.00 $0.00 $0.00
THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY $68.63 $35.25 $103.88 Above median $0.00 $0.00 $0.00 $0.00
TILE FINISHER $49.59 $34.25 $83.84 Top 10% +176% vs market $0.00 $0.00 $0.00 $0.00
TILE LAYER $64.40 $37.13 $101.53 Top 10% $0.00 $0.00 $0.00 $0.00
TON UP TO 25 TON) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS 2.00 CRANE OPERATORS 3.00 LOADER OPERATORS .50 S $59.04 $31.32 $90.36 $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $59.19 $35.25 $94.44 $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $75.13 $35.25 $110.38 Top 10% $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $77.82 $35.25 $113.07 Top 10% $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $64.02 $35.25 $99.27 Above median $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $59.67 $35.25 $94.92 $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $63.70 $35.25 $98.95 Above median $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN $60.42 $35.25 $95.67 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Putnam, NY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Putnam

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260025-16089-hvy →