Heavy Construction — Montgomery, New York

WD NY20260002-16071-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER in Montgomery, New York (construction type: heavy) is $41.74/hr base + $27.58/hr fringe = $69.32/hr total package (WD NY20260002-16071-hvy, Rev. 2).

Scroll down for all 111 trade classifications covered by this determination.

WD Number: NY20260002-16071-hvy
Revision: 2
Construction Type: heavy
State: New York (NY)
County: Montgomery
Effective: May 17, 2026
Trades covered: 111
Official source: SAM.gov reference NY20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS/INSULATOR WORKER $41.74 $27.58 $69.32 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.34 $27.66 $71.00 +97% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $36.38 $24.65 $61.03 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $44.28 $24.50 $68.78 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS & SOFT FLOOR LAYERS: BUILDING CONSTRUCTION $36.38 $24.65 $61.03 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: (DIVERS) $45.28 $24.50 $69.78 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY AND HIGHWAY CONSTRUCTION) $44.72 $31.23 $75.95 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS $69.28 $24.50 $93.78 Bottom 10% +206% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION $44.28 $24.50 $68.78 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON) $48.00 $32.09 $80.09 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (GREENE COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTIO $46.50 $40.57 $87.07 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $43.35 $30.73 $74.08 +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $54.19 $35.69 $89.88 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $43.53 $30.75 $74.28 +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $49.25 $31.15 $80.40 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $48.77 $31.31 $80.08 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $32.51 $29.93 $62.44 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND WASHINGTON COUNTIES). FOOTNOTE: A $57.73 $38.44 $96.17 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC (COLUMBIA COUNTY; GREEN COUNTY) FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 $76.12 $38.98 $115.10 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $37.25 $33.54 $70.79 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $41.74 $27.58 $69.32 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (FULTON; MONTGOMERY:) $35.50 $31.39 $66.89 Top 10% +46% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON; GREENE, MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:) $38.75 $25.48 $64.23 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; FULTON; GREENE, MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES $38.75 $25.48 $64.23 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; FULTON; GREENE $38.50 $25.48 $63.98 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE COUNTY HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDE $34.15 $27.15 $61.30 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, PO $38.90 $27.15 $66.05 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remedia $43.15 $27.15 $70.30 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE COUNTY HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS D $48.00 $27.15 $75.15 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE EQUIPMENT $38.90 $27.15 $66.05 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING A $43.15 $27.15 $70.30 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON; MONTGOMERY; SARATOGA; SCHENECTADY AND SCHOHARIE COUNTIES $39.19 $26.75 $65.94 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MA $39.39 $26.75 $66.14 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, POWDERMAN FULTON; MONTGOMERY; SARA $39.59 $26.75 $66.34 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON; MONTGOMERY; SARATOGA; SCHENECTADY AND SCHOHARIE COUN $39.79 $26.75 $66.54 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL FULTON; MONTGOMERY; SARATOGA; SCHENECTADY AND SCHOHARIE COUNTIES $41.69 $26.75 $68.44 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON; MONTGOMERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABO $24.00 $20.64 $44.64 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (FULTON; MONTGOMERY). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRES $23.00 $20.64 $43.64 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSU $24.00 $20.64 $44.64 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON; MONTGOMERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, T $22.50 $20.64 $43.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR POWER LIFT (FULTON; MONTGOMERY). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S $22.65 $20.64 $43.29 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON; MONTGOMERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY $22.90 $20.64 $43.54 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON; MONTGOMERY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP $28.05 $23.74 $51.79 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORT $28.25 $23.74 $51.99 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN FULTON; MONTGOMERY FOOTNOTE: A. PAID $28.45 $23.74 $52.19 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON; MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. J $28.65 $23.74 $52.39 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING: GROUP 1 COMMON LABORERS ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY $36.16 $26.68 $62.84 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR LE $37.51 $26.68 $64.19 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL CUSTODIAL WORK $36.45 $27.80 $64.25 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWD $42.80 $27.80 $70.60 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; ASPHALT SCREEDMAN; DRILLERS; LASER BEAM OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA FOOTNOTE: A $43.90 $27.80 $71.70 Top 10% +159% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY; RENSSELAER; COLUMBIA. GREENE. WASHINGTON COUNTY. SARATAG $41.69 $27.65 $69.34 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN ALBANY; RENSSELAE $41.89 $27.65 $69.54 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS ALBANY; RENSSELAER; COLUMBIA. GREENE. WASHINGTON COUNTY. S $42.29 $27.65 $69.94 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL ALBANY; RENSSELAER; COLUMBIA. GREENE. WASHINGTON COUNTY. SARATAGO COUNTY FOOTNOTE: PAID HO $44.19 $27.65 $71.84 Top 10% +159% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHER $35.94 $24.66 $60.60 Bottom 10% +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT WORK $35.94 $24.66 $60.60 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: PAINTER/PAPERHANGER $35.94 $24.66 $60.60 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: STRUCTURAL STEEL AND BRIDGE $56.25 $55.14 $111.39 Top 10% +314% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 1 ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA $33.50 $21.69 $55.19 Bottom 10% +105% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 1 ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA $34.50 $21.69 $56.19 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 2 ZONE #2 ALL OF WASHINGTON COUNTY $33.50 $21.69 $55.19 Bottom 10% +105% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 2 ZONE #2 ALL OF WASHINGTON COUNTY $34.50 $21.69 $56.19 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: SPRAY RATE $36.94 $24.66 $61.60 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDING STEAMFITTING $31.40 $31.70 $63.10 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; SARATOGA) $55.26 $29.12 $84.38 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (SARATOGA; WASHINGTON COUNTY:) $44.88 $33.60 $78.48 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRU $55.42 $33.20 $88.62 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A SHOVEL, ALL EXCAVATORS, GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTE $54.93 $33.20 $88.13 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP B BACKHOE,, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACK $53.91 $33.20 $87.11 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, M $51.01 $33.20 $84.21 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO $57.30 $33.55 $90.85 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY $56.39 $33.55 $89.94 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $53.82 $33.55 $87.37 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA $63.30 $33.55 $96.85 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN $61.80 $33.55 $95.35 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA $60.30 $33.55 $93.85 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $58.91 $33.55 $92.46 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.50 $19.84 $50.34 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.05 $24.27 $62.32 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. IF ANY OF T $33.73 $33.04 $66.77 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $47.85 $28.94 $76.79 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS, SINGLE AXLE DUMP TRUCKS, DUMPSTERS, RECEIVERS, GREASERS, TRUCK TIREMAN FOOTNOT $41.23 $31.42 $72.65 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS ON SITE FOOTNOTES: A. ONE WE $33.65 $30.79 $64.44 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY TRAILERS FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 Y $33.95 $30.79 $64.74 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TANDEMS, BATCH TRUCKS, MECHANICS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSG $41.29 $31.42 $72.71 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC $41.38 $31.42 $72.80 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE CARRIER, SEL $41.52 $31.42 $72.94 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED FOOTNOTE: A. PAID HOLIDA $41.69 $31.42 $73.11 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, NY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Montgomery

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260002-16071-hvy →