Building Construction — Madison, New York

WD NY20260023-16122-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Madison, New York (construction type: building) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260023-16122-bld, Rev. 2).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: NY20260023-16122-bld
Revision: 2
Construction Type: building
State: New York (NY)
County: Madison
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference NY20260023View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.25 $27.29 $70.54 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.16 $19.77 $52.93 +42% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $32.64 $21.97 $54.61 +78% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.12 $16.84 $49.96 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $23.25 $21.21 $44.46 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS, HVAC/TEMPERATURE CONTROLS AND SOUND AND COMMUNICATION SYSTEMS $34.65 $15.37 $50.02 +34% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $30.00 $27.59 $57.59 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $31.23 $14.50 $45.73 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $37.16 $30.68 $67.84 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
LABORER (ASBESTOS ABATEMENT) $24.00 $20.64 $44.64 +61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $20.89 $10.46 $31.35 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.50 $20.64 $43.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $23.88 $19.60 $43.48 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $23.95 $21.45 $45.40 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.47 $0.00 $20.47 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $29.98 $22.74 $52.72 Bottom 10% +39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $36.17 $17.76 $53.93 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $31.03 $20.05 $51.08 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $33.14 $21.04 $54.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.19 $17.42 $47.61 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.51 $12.31 $40.82 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $28.35 $25.21 $53.56 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $23.25 $21.21 $44.46 +65% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $31.43 $23.61 $55.04 +46% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.51 $24.57 $60.08 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $48.11 $31.85 $79.96 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $49.61 $31.85 $81.46 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $35.80 $25.99 $61.79 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER (INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING) $36.29 $23.31 $59.60 +69% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.06 $30.71 $75.77 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.81 $17.50 $49.31 Above median +62% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Madison, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Madison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260023-16122-bld →