Building Construction — Jefferson, New York

WD NY20260022-16097-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Jefferson, New York (construction type: building) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260022-16097-bld, Rev. 2).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: NY20260022-16097-bld
Revision: 2
Construction Type: building
State: New York (NY)
County: Jefferson
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference NY20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.25 $27.29 $70.54 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.45 $20.14 $53.59 +44% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $25.70 $15.85 $41.55 +36% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.61 $5.82 $36.43 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $30.90 $25.36 $56.26 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.50 $28.38 $71.88 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.52 $11.47 $40.99 +42% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $28.70 $22.02 $50.72 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $28.00 $21.43 $49.43 Above median +8% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $29.41 $21.63 $51.04 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
LABORER $27.03 $25.45 $52.48 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $29.18 $17.72 $46.90 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $20.89 $10.46 $31.35 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $27.03 $25.45 $52.48 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $27.03 $25.45 $52.48 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.47 $0.00 $20.47 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $30.20 $23.83 $54.03 Bottom 10% +43% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $33.62 $17.98 $51.60 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $36.17 $17.76 $53.93 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $31.60 $21.52 $53.12 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $33.14 $21.04 $54.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $30.19 $17.42 $47.61 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $27.74 $5.89 $33.63 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $29.90 $25.36 $55.26 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $22.32 $13.95 $36.27 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $31.43 $23.61 $55.04 +46% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $33.72 $16.03 $49.75 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $49.61 $31.85 $81.46 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $35.80 $25.99 $61.79 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING $28.11 $17.75 $45.86 +30% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.06 $30.71 $75.77 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.81 $17.50 $49.31 Above median +62% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jefferson, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jefferson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260022-16097-bld →