Davis-Bacon Wage Determinations — Genesee, New York

Genesee has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Genesee, New York cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: NY20260110-16105-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: NY20260029-16105-hvy Rev. 2
Effective: May 17, 2026
View trade rates →
highway Active
WD: NY20260029-16105-hwy Rev. 2
Effective: May 17, 2026
View trade rates →
residential Active
WD: NY20260077-16105-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Genesee

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid heavy $64.59 $42.92 $107.51 WD →
2 ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA heavy $62.39 $38.44 $100.83 WD →
3 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un heavy $61.56 $36.21 $97.77 WD →
4 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN highway $61.56 $36.21 $97.77 WD →
5 ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU highway $61.56 $36.21 $97.77 WD →
6 OPERATING ENGINEER: GROUP 4TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRIST heavy $61.38 $35.75 $97.13 WD →
7 ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER highway $63.14 $33.82 $96.96 WD →
8 OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY highway $60.84 $35.00 $95.84 WD →
9 PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY B highway $59.88 $35.75 $95.63 WD →
10 NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE W heavy $58.38 $35.75 $94.13 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →