Building Construction — Erie, New York

WD NY20260050-16081-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Erie, New York (construction type: building) is $39.35/hr base + $33.18/hr fringe = $72.53/hr total package (WD NY20260050-16081-bld, Rev. 1).

Scroll down for all 69 trade classifications covered by this determination.

WD Number: NY20260050-16081-bld
Revision: 1
Construction Type: building
State: New York (NY)
County: Erie
Effective: May 17, 2026
Trades covered: 69
Official source: SAM.gov reference NY20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $39.35 $33.18 $72.53 +101% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $39.44 $32.11 $71.55 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $36.73 $23.39 $60.12 $0.00 $0.00 $0.00 $0.00
CARPENTER $34.73 $28.61 $63.34 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
CEMENT FINISHER $33.65 $31.47 $65.12 Above median $0.00 $0.00 $0.00 $0.00
CEMENT MASON $32.53 $22.10 $54.63 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL $44.50 $36.05 $80.55 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL $22.90 $21.38 $44.28 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL $14.20 $14.02 $28.22 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.50 $36.06 $80.56 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $62.39 $38.44 $100.83 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $34.68 $27.64 $62.32 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.49 $32.30 $67.79 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: SHEETER $35.49 $32.30 $67.79 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 MORTAR MIXER, ASPHALT SMOOTHERS, PNEUMATIC GAS ELECTRIC TOOL OPERATOR INCLUDING ALL FORMS OF BUSTERS, JACKHAMMERS, AND CHIPPING GUNS $30.60 $28.25 $58.85 +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 WORKER ON ANY SWING SCAFFOLD, BLASTER, PLUMBING LABORER, WAGON DRILLER, BOTTOM, LASER SETTER, ASPHALT RAKERS, ASPHALT SCREED MAN $30.71 $28.25 $58.96 +113% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 STONE CUTTER, CURB SETTER AND FLAG LAYER $31.18 $28.25 $59.43 +114% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 ASBESTOS REMOVAL, DELEADER $31.93 $28.25 $60.18 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 HAZARDOUS WASTE WORKER $32.43 $28.25 $60.68 +119% vs market $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $36.85 $30.80 $67.65 $0.00 $0.00 $0.00 $0.00
PAINTERS () $25.95 $23.69 $49.64 +84% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLL (ENTIRE COUNTY,) $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT () $25.95 $23.69 $49.64 +84% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLASTING, SWING SCAFFOLD OR ANY HANGED RIGGING PLATFORM, EPOXY (ENTIRE COUNTY,) $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAYING, PAPERHANGERS, SAND BLASTING, SWINGING SCAFFOLD () $25.95 $23.69 $49.64 +84% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: TAPERS () $26.45 $23.69 $50.14 +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: TAPING/DRYWALL (ENTIRE COUNTY,) $34.00 $28.51 $62.51 +132% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: ERIE- ALL TOWNSHIPS IN THE COUNTY $42.20 $29.80 $72.00 +91% vs market $0.00 $0.00 $0.00 $0.00
PLASTER SCAFFOLD BUILDER, PNEUMATIC GAS, ELECTRIC OPERATOR, INCLUDING ALL FORMS OF BUSTERS, JACKHAMMERS, CHIPPING GUNS AND STEEL BURNERS $30.43 $28.25 $58.68 $0.00 $0.00 $0.00 $0.00
PLASTERER $33.05 $25.09 $58.14 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT, ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER $44.23 $35.40 $79.63 Bottom 10% +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS $39.14 $35.40 $74.54 Bottom 10% +93% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ANY CRANE UP TO 60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR $47.48 $35.40 $82.88 +115% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 ANY CRANE 61 - 199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR $48.48 $35.40 $83.88 +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 ANY CRANE 200 - 399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEA $48.98 $35.40 $84.38 +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 ANY CRANE 400 TONS AND OVER NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW $49.48 $35.40 $84.88 +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 ANY TOWER CRANES NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY $49.98 $35.40 $85.38 +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 8 MASTER MEACHANIC NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY $45.47 $35.40 $80.87 +110% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: COMPOSITION $34.96 $26.03 $60.99 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: SLATE & TILE $35.11 $26.03 $61.14 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $29.18 $68.68 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $15.94 $3.88 $19.82 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $34.71 $17.54 $52.25 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $34.71 $17.54 $52.25 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
TILESETTER & TERRAZZO WORKER $38.85 $32.20 $71.05 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. EUCLIDS ADD $0.25 $47.18 $15.09 $62.27 +114% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPE $32.00 $0.00 $32.00 +10% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Erie, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.