Highway Construction — Delaware, New York
WD NY20260021-16100-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKERS/INSULATOR in Delaware, New York (construction type: highway) is $41.74/hr base + $27.58/hr fringe = $69.32/hr total package (WD NY20260021-16100-hwy, Rev. 1).
Scroll down for all 75 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR | $41.74 | $27.58 | $69.32 Above median +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCL | $49.40 | $32.45 | $81.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.34 | $27.66 | $71.00 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $50.43 | $33.29 | $83.72 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $39.52 | $27.16 | $66.68 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON | $38.63 | $25.05 | $63.68 Above median +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.68 | $33.06 | $75.74 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DELAWARE COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECT | $46.50 | $40.57 | $87.07 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $42.29 | $30.66 | $72.95 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $52.86 | $35.60 | $88.46 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $47.57 | $31.03 | $78.60 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $31.72 | $29.87 | $61.59 Bottom 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $30.00 | $31.95 | $61.95 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES; HAMMER VIBRATORY; HOISTS, HOPPERS, HOPPERS DOORS; HYDRO-BLASTER; LADDERS; LADDERVATOR; LOCOMO | $58.22 | $37.50 | $95.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $41.74 | $27.58 | $69.32 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS | $38.50 | $25.48 | $63.98 Bottom 10% +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS | $38.75 | $25.48 | $64.23 Bottom 10% +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF | $44.80 | $32.45 | $77.25 +179% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY: GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN. FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDEN | $54.70 | $32.45 | $87.15 +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY: GROUP 1 | $40.80 | $32.45 | $73.25 +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 1 | $35.56 | $25.60 | $61.16 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER | $35.76 | $25.60 | $61.36 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN FOOTNOTE A. PAID HOL | $35.96 | $25.60 | $61.56 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, L | $36.16 | $25.60 | $61.76 +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE REMOVAL FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH | $38.76 | $25.60 | $64.36 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $42.06 | $30.59 | $72.65 Above median +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER: SOUTHERN ZONE | $42.63 | $32.24 | $74.87 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS : GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULI | $61.29 | $37.50 | $98.79 +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE-PAVEMENT-PROFILER; AUTOGRADE-PAVEMENT-PROFILER;AUTOGRADE SLIPFORM PAVER; BACKHOE; CENTRAL POWER PLANTS; C | $61.72 | $37.50 | $99.22 +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANES; DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES | $70.24 | $37.50 | $107.74 +179% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1: BACKHOE; CRANES; DRAGLINES, FRONT END LOADERS, GRADALLS, HELICOPTERS, HELICOPTERS; SCOOPER KOEHRING; TRENCH MACHIN | $62.35 | $37.50 | $99.85 +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNN | $69.96 | $37.50 | $107.46 +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES; DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTE | $68.58 | $37.50 | $106.08 +175% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2: ""A"" FRAME; BACKHOE; BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE | $60.70 | $37.50 | $98.20 +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT AB | $68.37 | $37.50 | $105.87 +174% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR; CHIEF OF PARTY; FRONT END LOADERS; GENERATORS; GIRAFFE GR | $58.56 | $37.50 | $96.06 +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDA | $64.85 | $37.50 | $102.35 +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS | $58.63 | $37.50 | $96.13 +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS; CONCRETE SPREADERS; CONVEYOR LOADERS; ENGINES, LARGE DIESEL AND STAGING | $56.59 | $37.50 | $94.09 +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DR | $61.28 | $37.50 | $98.78 +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4: COMPRESSOR; DOPE POTS; DUST COLLECTORS; PUMPS; PUMPS; PUMPS, DIESEL ENGINE AND HYDRAULIC; WELDING MACHINES, GAS OR | $57.10 | $37.50 | $94.60 +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTP | $57.10 | $37.50 | $94.60 +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS | $52.88 | $37.50 | $90.38 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5: OILER NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEA | $54.07 | $37.50 | $91.57 +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUN | $53.34 | $37.50 | $90.84 +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTERS PILOT NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS | $63.54 | $37.50 | $101.04 +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PA | $53.34 | $37.50 | $90.84 +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 PAID HOLIDAYS: A. NEW YEARS | $64.28 | $37.50 | $101.78 +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 7 HELICOPTER PILOT . NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID H | $65.74 | $37.50 | $103.24 +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME; BACKHOE; BOOM ATTACHMENT ON LOADERS NOT APPLICABLE T | $60.13 | $37.50 | $97.63 +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.50 | $19.84 | $50.34 Above median +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.94 | $20.89 | $56.83 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS; SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN FOOTNO | $37.27 | $29.29 | $66.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCKS; MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGI | $37.27 | $29.29 | $66.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC | $37.27 | $29.29 | $66.56 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE CARRIER; SEL | $37.47 | $29.29 | $66.76 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED FOOTNOTE: A. PAID HOLIDAYS | $37.47 | $29.29 | $66.76 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Delaware, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Delaware
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Delaware, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.