Heavy Construction — Chenango, New York

WD NY20260004-16118-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER: INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. AL in Chenango, New York (construction type: heavy) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260004-16118-hvy, Rev. 2).

Scroll down for all 78 trade classifications covered by this determination.

WD Number: NY20260004-16118-hvy
Revision: 2
Construction Type: heavy
State: New York (NY)
County: Chenango
Effective: May 17, 2026
Trades covered: 78
Official source: SAM.gov reference NY20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS/INSULATOR WORKER: INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. AL $43.25 $27.29 $70.54 $0.00 $0.00 $0.00 $0.00
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLU $41.90 $30.40 $72.30 $0.00 $0.00 $0.00 $0.00
BOILERMAKER BROOME AND CHENANGO $43.34 $27.66 $71.00 +97% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYERS, CEMENT MASONS, STONE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION, BROOME COUNTY $34.34 $28.46 $62.80 +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER HEAVY & HIGHWAY CONSTRUCTION BROOME COUNTY FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHE $39.52 $27.16 $66.68 +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER HEAVY & HIGHWAY CONSTRUCTION CHENANGO COUNTY FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SC $44.52 $27.16 $71.68 +134% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, BUILDING CONSTRUCTION: CARPENTERS, CARPET LAYER, DRYWALL APPLICATOR, FLOOR COVERER, LATHER. FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY A $31.69 $21.92 $53.61 +75% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHTS BUILDING CONSTRUCTION BROOME COUNTY FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HI $31.69 $21.92 $53.61 +75% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASONS: HEAVY AND HIGHWAY CONSTRUCTION, BROOME & CHENANGO COUNTIES $38.63 $25.05 $63.68 +110% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BROOME AND CHENANGO HEAVY AND HIGHWAY)..$ 42.68 33.06 CABLE SPLICER (BROOME AND CHENANGO HEAVY AND HIGHWAY) $50.43 $33.29 $83.72 +125% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN CHENANGO: HEAVY AND HIGHWAY $50.50 $35.03 $85.53 +130% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECO $38.73 $6.93 $45.66 +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER BROOME AND CHENANGO FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEM $49.25 $31.15 $80.40 +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER BROOME AND CHENANGO A. NEW YEAR'S DAY, PRESIDENT'S DAY, GO $40.81 $6.99 $47.80 +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN BROOME AND CHENANGO A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD F $20.53 $6.39 $26.92 -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION, (SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED $52.33 $31.36 $83.69 +125% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $42.82 $105.96 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: FLAGMAN (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PL $31.72 $29.87 $61.59 +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: GROUNDMAN (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: GROUNDMAN TRUCK DRIVER (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH $44.93 $30.85 $75.78 +103% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LINEMAN & TECHNICIAN (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRI $52.86 $35.60 $88.46 +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: MECHANIC (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, P $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC BROOME AND CHENANGO FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED $58.44 $38.44 $96.88 +62% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $30.00 $31.95 $61.95 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF $38.50 $25.04 $63.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER $37.16 $30.68 $67.84 +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMEN, REINFORCEMENT, RIGGER, MACHINERY MOVER, FENCE ERECTOR, STONE DERRICKMAN (CHENANGO:) $35.50 $31.39 $66.89 +46% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY AND HIGHWAY GROUP 1 FLAGPERSON, GATEPERSON TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY FOOTNOTES: A. PAID HOLIDAYS: N $38.40 $30.40 $68.80 +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY AND HIGHWAY GROUP 2 GENERAL LABORERS, CHUCK TENDERS, HANDLING AND DISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF $38.40 $30.40 $68.80 +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER HEAVY AND HIGHWAY GROUP 4 ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANG $46.75 $30.40 $77.15 +178% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORER HEAVY AND HIGHWAY: GROUP 1 LABORERS, FLAGGERS, OUTBOARD AND HAND BOATS (BROOME; CHENANGO) $35.56 $25.60 $61.16 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORER HEAVY AND HIGHWAY: GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE, BIN CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKH $35.76 $25.60 $61.36 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORER HEAVY AND HIGHWAY: GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (BROOME; CHENANGO).$ 36.16 25.60 LABORER LABORER HEAV $35.96 $25.60 $61.56 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORER HEAVY AND HIGHWAY: GROUP 5 ASBESTOS AND HAZARDOUS WASTE REMOVAL (BROOME; CHENANGO) $38.76 $25.60 $64.36 +132% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORERS BUILDING: GROUP 1 COMMON LABORERS BROOME $26.50 $22.46 $48.96 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORERS BUILDING: GROUP 2 MASONRY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT AND BLASTERS BROOME $28.50 $22.46 $50.96 +84% vs market $0.00 $0.00 $0.00 $0.00
LABORER LABORERS BUILDING: GROUP 3 ASBESTOS AND HAZARDOUS WASTE REMOVAL BROOME $28.50 $22.46 $50.96 +84% vs market $0.00 $0.00 $0.00 $0.00
MARBLE MASONS, TILE LAYERS, AND TERRAZZO WORKERS: BUILDING CONSTRUCTION, BROOME COUNTY $34.34 $28.46 $62.80 $0.00 $0.00 $0.00 $0.00
MARBLE, TILE AND TERRAZZO FINISHERS: BUILDING CONSTRUCTION, BROOME COUNTY $34.34 $28.46 $62.80 $0.00 $0.00 $0.00 $0.00
PAINTERS $28.10 $23.83 $51.93 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $29.00 $23.83 $52.83 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $28.88 $23.83 $52.71 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $28.60 $23.83 $52.43 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: (STRUCTURAL STEEL SPRAY WORK).$ 28.10 23.83 PAINTERS: (SPRAY WORK/STEEPLE JACK) $28.50 $23.83 $52.33 +94% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: SOUTHERN ZONE (BROOME COUNTY TOWNSHIPS OF LISLE, TRIANGLE, BARKER, NANTICOKE, NEWARK VALLEY, OWEGO, MAINE, UNION, VESTAL, KIRKWOOD $44.91 $33.31 $78.22 +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO $57.30 $33.55 $90.85 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY $56.39 $33.55 $89.94 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $53.82 $33.55 $87.37 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA $63.30 $33.55 $96.85 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN $61.80 $33.55 $95.35 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA $60.30 $33.55 $93.85 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $58.61 $33.55 $92.16 Bottom 10% +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR $51.71 $32.80 $84.51 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A SHOVEL, ALL EXCAVATORS, GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRA $49.31 $32.80 $82.11 +113% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD R $48.85 $32.80 $81.65 +112% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, BUILDING:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP $46.54 $32.80 $79.34 +106% vs market $0.00 $0.00 $0.00 $0.00
ROOFER ( BROOME AND CHENANGO $30.50 $19.84 $50.34 +65% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.94 $20.89 $56.83 +61% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION: PROJECTS OVER $10 MILLION (CHENANGO COUNTY:) $46.29 $23.31 $69.60 +97% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER: PROJECTS WITH SHEETMETAL WORK CONTRACTS TOTALLING $10 MILLION OR LESS (CHENANGO COUNTY:) $36.29 $23.31 $59.60 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER BROOME AND CHENANGO $45.06 $30.71 $75.77 +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 PICKUPS; PANEL TRUCKS; FLATBOY MATERIAL TRUCKS; SINGLE-AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMEN FOOTNOTE $37.27 $29.29 $66.56 +129% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCKS MECHANICS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSG $37.27 $29.29 $66.56 +129% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTORS TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC $37.27 $29.29 $66.56 +129% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED; STRADDLE CARRIER; SEL $37.47 $29.29 $66.76 +129% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK-DUMP; TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF LOADED FOOTNOTES: A. PAID HOLID $37.47 $29.29 $66.76 +129% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Chenango, NY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Chenango

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260004-16118-hvy →