Heavy Construction — Cayuga, New York
WD NY20260036-16116-hvy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER in Cayuga, New York (construction type: heavy) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260036-16116-hvy, Rev. 2).
Scroll down for all 54 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS/INSULATOR WORKER | $43.25 | $27.29 | $70.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $35.23 | $26.61 | $61.84 +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYERS, STONEMASONS, CEMENT MASONS, PLASTERERS, POINTER, CLEANERS & CAULKERS | $38.30 | $23.71 | $62.01 +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: MARBLE, TILE, AND TERRAZZO WORKERS | $34.92 | $21.29 | $56.21 +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $39.52 | $27.16 | $66.68 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKSGIVING DAY | $37.23 | $19.51 | $56.74 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $44.50 | $31.89 | $76.39 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $42.29 | $30.66 | $72.95 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $52.86 | $35.60 | $88.46 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $47.57 | $31.03 | $78.60 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $31.72 | $29.87 | $61.59 Bottom 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: CABLE SPLICING | $55.55 | $35.03 | $90.58 +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: ELECTRICIANS | $50.50 | $35.03 | $85.53 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $30.00 | $27.59 | $57.59 Above median +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $38.50 | $25.04 | $63.54 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.16 | $30.68 | $67.84 Above median +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 LABORERS, FLAGGERS, OUTBOARD AND HAND BOATS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, TH | $36.30 | $25.70 | $62.00 +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 BULL FLOAT; CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR | $36.50 | $25.70 | $62.20 +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 ALL ROCK OR DRILL MACHINE OPERATOR; ACETYLENE TORCH OPERATOR, ASPHALT RAKER, POWDERMAN. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, ME | $36.70 | $25.70 | $62.40 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 BLASTER, FORM SETTERS, STONE OR GRANITE CURB SETTERS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABO | $36.90 | $25.70 | $62.60 +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $42.06 | $30.59 | $72.65 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER: HVAC AND REFRIGERATION SERVICE ON ALL HVAC AND REFRIGERATION SERVICE WORK; ALL HEATING PLUMBING AIR CONDITIONING, RE | $28.19 | $21.91 | $50.10 +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK | $35.51 | $24.57 | $60.08 Top 10% +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO | $55.85 | $33.40 | $89.25 Bottom 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY | $54.97 | $33.40 | $88.37 Bottom 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | $33.40 | $85.09 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DA | $65.51 | $33.40 | $98.91 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, C | $60.35 | $33.40 | $93.75 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY | $58.85 | $33.40 | $92.25 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS | $57.20 | $33.40 | $90.60 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $35.80 | $25.99 | $61.79 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $46.29 | $23.31 | $69.60 Above median +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.29 | $23.31 | $59.60 +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS, SINGLE-AXLE DUMP TRUCKS, DUPSTERS, RECEIVERS, GREASERS, TRUCK TIREMEN, TANDEMS AN | $35.48 | $31.58 | $67.06 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE, OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED,STRADDLE CARRIER, AND SEL | $35.83 | $31.58 | $67.41 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Cayuga, NY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Cayuga
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Cayuga, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.