Highway Construction — Cattaraugus, New York
WD NY20260008-16079-hwy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Cattaraugus, New York (construction type: highway) is $37.65/hr base + $30.69/hr fringe = $68.34/hr total package (WD NY20260008-16079-hwy, Rev. 2).
Scroll down for all 98 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.65 | $30.69 | $68.34 Above median +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $39.35 | $33.18 | $72.53 +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON (ERIE, CATTARAUGUS) | $37.44 | $32.71 | $70.15 +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (CHAUTAUQUA, CATTARAUGUS) | $35.75 | $20.68 | $56.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER (ERIE, CATTARAUGUS) | $36.73 | $23.39 | $60.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, HEAVY & HIGHWAY (CATTARAUGUS) FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFOR | $38.18 | $26.11 | $64.29 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, HEAVY & HIGHWAY (ERIE) FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND A | $41.19 | $31.55 | $72.74 +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: (CHAUTAUQUA; CATTARAUGUS FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE | $38.18 | $26.11 | $64.29 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT FINISHER | $33.65 | $31.47 | $65.12 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON (ERIE, CATTARAUGUS) | $36.82 | $31.33 | $68.15 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (CHATAUQUA COUNTY AND CATTARAUGUS COUNTY) | $38.63 | $25.05 | $63.68 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM (ERIE, CATTARAUGUS) | $14.20 | $14.02 | $28.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM, INSTALLER (ERIE, CATTARAUGUS) | $22.90 | $21.38 | $44.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM, MASTER TECHNICIAN (ERIE, CATTARAUGUS) | $44.50 | $36.05 | $80.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM, SOUND WIREMAN (ERIE, CATTARAUGUS) | $44.50 | $36.05 | $80.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (CHAUTAUQUA, CATTARAUGUS) | $42.50 | $27.23 | $69.73 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ERIE, CATTARAUGUS) | $44.50 | $36.06 | $80.56 +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $42.29 | $30.66 | $72.95 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $52.86 | $35.60 | $88.46 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $47.57 | $31.03 | $78.60 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT | $31.72 | $29.87 | $61.59 Bottom 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $62.39 | $38.44 | $100.83 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $34.68 | $27.64 | $62.32 Above median +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $34.15 | $26.09 | $60.24 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $33.14 | $32.30 | $65.44 Above median +43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $35.49 | $32.30 | $67.79 Above median +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $34.06 | $30.80 | $64.86 Above median +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: SHEETER | $35.49 | $32.30 | $67.79 Above median +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 LABORERS; FLAGMEN; OUTBOARD AND HAND BOATS; DEMOLITION WORKER; IBC BARRIERS; GUARD RAILS;ROAD MARKERS FOR HEAVY/HIGHWAY & TUNNEL: ADDI | $34.66 | $28.65 | $63.31 +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1: GENERAL; FLAGMAN; TOP MAN; WRECKERS | $34.66 | $28.65 | $63.31 +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1: MOLE NIPPER; POWDER HANDLER; TOP LABORER FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS | $36.16 | $28.65 | $64.81 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER MORTAR | $34.86 | $28.65 | $63.51 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2: AIR SPADE; JACKHAMMER; PAVEMENT BREAKER FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS W | $36.31 | $28.65 | $64.96 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS; ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; WELDER FOR HEAVY/HIGHWAY & TUNNEL: ADDITIO | $35.06 | $28.65 | $63.71 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3: MORTAR MIXER OVER 8 FEET IN DEPTH | $34.81 | $28.65 | $63.46 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3: MORTAR MIXER OVER 8 FEET IN DEPTH LABORER GROUP 2: FOUNDATION; ROD CARRIERS; PLASTER TENDER; SCAFFOLD BOOTMAN; PNEUMATIC, GAS, ELECTR | $34.76 | $28.65 | $63.41 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 3: TOP BELL FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO | $36.41 | $28.65 | $65.06 +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4 BLASTERS; CURB & FLAT WORK FORM SETTERS; STONE OR GRANITE CURB SETTERS FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE | $35.26 | $28.65 | $63.91 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4: BOTTOM BELL; SIDE OR ROOFBELT DRILLER; BURNERS; TRACKMEN; NIPPERS; DERAILMEN; HOSEMEN; GROUTMEN; GRAVELMEN; FORM WORKERS; MOVERS & SH | $36.91 | $28.65 | $65.56 +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 4: PAVEMENT FORMSETTER; STEELBURNER; CAISSON; WAGON DRILL OPERATOR; PIPELAYER; SWING SCAFFOLD | $34.91 | $28.65 | $63.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5: POWDER MONKEY FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDE | $37.01 | $28.65 | $65.66 +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 5: UTILITY PAVE DRIVER; LASER OPERATOR | $35.26 | $28.65 | $63.91 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6: BLASTER | $35.66 | $28.65 | $64.31 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 6: BLASTERS; IRONMEN; WELDER; HEADING DRILLER (ERIE COUNTY TUNNEL FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR AL | $37.41 | $28.65 | $66.06 +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 7: PILEDRIVER; RIGGER FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 | $37.66 | $28.65 | $66.31 +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 1 | $33.93 | $28.69 | $62.62 +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 2 | $34.33 | $28.69 | $63.02 +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAY GROUP 2: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS, TAIL OR SCREW OPERATOR ON ASPHA | $34.33 | $28.69 | $63.02 +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY AND HIGHWAYGROUP 1: FLAGMAN, OUTBOARD AND HAND BOATS, BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOT, GIN BUGGY, HAND OR | $33.93 | $28.69 | $62.62 +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER (ERIE, CATTARAUGUS) | $31.72 | $29.18 | $60.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRIDGE PAINTER | $42.06 | $30.59 | $72.65 +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRIDGES | $42.06 | $30.59 | $72.65 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRIDGES (CATTARAUGUS COUNTY) | $42.06 | $30.59 | $72.65 +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: CATTARAUGUS, CHAUTAUQUA & ERIE COUNTIES | $38.50 | $28.40 | $66.90 +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS:, BUILDING CONSTRUCTION: BRUSH AND ROLLER | $33.00 | $28.21 | $61.21 +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS:, BUILDING CONSTRUCTION: DRYWALL/TAPING | $34.00 | $28.51 | $62.51 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS:, BUILDING CONSTRUCTION: WALLCOVERING | $33.00 | $28.21 | $61.21 +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $33.05 | $25.09 | $58.14 Above median +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $42.20 | $29.80 | $72.00 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT, ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER | $47.39 | $36.89 | $84.28 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS | $42.89 | $36.89 | $79.78 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S | $50.64 | $36.89 | $87.53 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR' | $51.64 | $36.89 | $88.53 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR | $52.14 | $36.89 | $89.03 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS & OVER NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEA | $52.64 | $36.89 | $89.53 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY | $48.46 | $36.89 | $85.35 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $23.65 | $11.99 | $35.64 +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS: COMPOSITION | $34.96 | $26.03 | $60.99 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS: SLATE & TILE | $35.11 | $26.03 | $61.14 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $39.50 | $29.18 | $68.68 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.00 | $24.56 | $55.56 +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STEAMFITTER | $42.20 | $29.80 | $72.00 Bottom 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER (ERIE, CATTARAUGUS) | $34.71 | $17.54 | $52.25 +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER (ERIE, CATTARAUGUS) | $34.71 | $17.54 | $52.25 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILESETTER & TERRAZZO WORKER (ERIE, CATTARAUGUS) | $31.21 | $20.54 | $51.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS, SINGLE-AXLE DUMP TRUCKS, DUMPSTERS, TANDEMS, BATCH TRUCKS, MECHANICS SEMI TRAIL | $49.66 | $16.82 | $66.48 +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE CARRIER, SELF | $49.66 | $16.82 | $66.48 +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. FOOTNOTE: A. PENSI | $49.23 | $8.75 | $57.98 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPE | $32.00 | $0.00 | $32.00 +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Cattaraugus, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Cattaraugus
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Cattaraugus, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.