Highway Construction — Broome, New York
WD NY20260004-16115-hwy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER: INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. AL in Broome, New York (construction type: highway) is $43.25/hr base + $27.29/hr fringe = $70.54/hr total package (WD NY20260004-16115-hwy, Rev. 2).
Scroll down for all 78 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS/INSULATOR WORKER: INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. AL | $43.25 | $27.29 | $70.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLU | $41.90 | $30.40 | $72.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER BROOME AND CHENANGO | $43.34 | $27.66 | $71.00 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYERS, CEMENT MASONS, STONE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION, BROOME COUNTY | $34.34 | $28.46 | $62.80 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER HEAVY & HIGHWAY CONSTRUCTION BROOME COUNTY FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHE | $39.52 | $27.16 | $66.68 +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER HEAVY & HIGHWAY CONSTRUCTION CHENANGO COUNTY FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SC | $44.52 | $27.16 | $71.68 +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, BUILDING CONSTRUCTION: CARPENTERS, CARPET LAYER, DRYWALL APPLICATOR, FLOOR COVERER, LATHER. FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY A | $31.69 | $21.92 | $53.61 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: MILLWRIGHTS BUILDING CONSTRUCTION BROOME COUNTY FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HI | $31.69 | $21.92 | $53.61 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS: HEAVY AND HIGHWAY CONSTRUCTION, BROOME & CHENANGO COUNTIES | $38.63 | $25.05 | $63.68 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BROOME AND CHENANGO HEAVY AND HIGHWAY)..$ 42.68 33.06 CABLE SPLICER (BROOME AND CHENANGO HEAVY AND HIGHWAY) | $50.43 | $33.29 | $83.72 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN CHENANGO: HEAVY AND HIGHWAY | $50.50 | $35.03 | $85.53 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECO | $38.73 | $6.93 | $45.66 +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER BROOME AND CHENANGO FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEM | $49.25 | $31.15 | $80.40 +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER BROOME AND CHENANGO A. NEW YEAR'S DAY, PRESIDENT'S DAY, GO | $40.81 | $6.99 | $47.80 +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN BROOME AND CHENANGO A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD F | $20.53 | $6.39 | $26.92 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION, (SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED | $52.33 | $31.36 | $83.69 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $42.82 | $105.96 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: FLAGMAN (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PL | $31.72 | $29.87 | $61.59 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: GROUNDMAN (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $42.29 | $30.66 | $72.95 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: GROUNDMAN TRUCK DRIVER (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH | $44.93 | $30.85 | $75.78 +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: LINEMAN & TECHNICIAN (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRI | $52.86 | $35.60 | $88.46 +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: MECHANIC (BROOME AND CHENANGO) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, P | $42.29 | $30.66 | $72.95 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC BROOME AND CHENANGO FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED | $58.44 | $38.44 | $96.88 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $30.00 | $31.95 | $61.95 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF | $38.50 | $25.04 | $63.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER | $37.16 | $30.68 | $67.84 +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMEN, REINFORCEMENT, RIGGER, MACHINERY MOVER, FENCE ERECTOR, STONE DERRICKMAN (CHENANGO:) | $35.50 | $31.39 | $66.89 +46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER HEAVY AND HIGHWAY GROUP 1 FLAGPERSON, GATEPERSON TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY FOOTNOTES: A. PAID HOLIDAYS: N | $38.40 | $30.40 | $68.80 +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER HEAVY AND HIGHWAY GROUP 2 GENERAL LABORERS, CHUCK TENDERS, HANDLING AND DISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF | $38.40 | $30.40 | $68.80 +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER HEAVY AND HIGHWAY GROUP 4 ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANG | $46.75 | $30.40 | $77.15 +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORER HEAVY AND HIGHWAY: GROUP 1 LABORERS, FLAGGERS, OUTBOARD AND HAND BOATS (BROOME; CHENANGO) | $35.56 | $25.60 | $61.16 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORER HEAVY AND HIGHWAY: GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE, BIN CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKH | $35.76 | $25.60 | $61.36 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORER HEAVY AND HIGHWAY: GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (BROOME; CHENANGO).$ 36.16 25.60 LABORER LABORER HEAV | $35.96 | $25.60 | $61.56 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORER HEAVY AND HIGHWAY: GROUP 5 ASBESTOS AND HAZARDOUS WASTE REMOVAL (BROOME; CHENANGO) | $38.76 | $25.60 | $64.36 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORERS BUILDING: GROUP 1 COMMON LABORERS BROOME | $26.50 | $22.46 | $48.96 +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORERS BUILDING: GROUP 2 MASONRY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT AND BLASTERS BROOME | $28.50 | $22.46 | $50.96 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LABORERS BUILDING: GROUP 3 ASBESTOS AND HAZARDOUS WASTE REMOVAL BROOME | $28.50 | $22.46 | $50.96 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASONS, TILE LAYERS, AND TERRAZZO WORKERS: BUILDING CONSTRUCTION, BROOME COUNTY | $34.34 | $28.46 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE AND TERRAZZO FINISHERS: BUILDING CONSTRUCTION, BROOME COUNTY | $34.34 | $28.46 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $28.10 | $23.83 | $51.93 Above median +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $29.00 | $23.83 | $52.83 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $28.88 | $23.83 | $52.71 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $28.60 | $23.83 | $52.43 Above median +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: (STRUCTURAL STEEL SPRAY WORK).$ 28.10 23.83 PAINTERS: (SPRAY WORK/STEEPLE JACK) | $28.50 | $23.83 | $52.33 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: SOUTHERN ZONE (BROOME COUNTY TOWNSHIPS OF LISLE, TRIANGLE, BARKER, NANTICOKE, NEWARK VALLEY, OWEGO, MAINE, UNION, VESTAL, KIRKWOOD | $44.91 | $33.31 | $78.22 +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO | $57.30 | $33.55 | $90.85 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY | $56.39 | $33.55 | $89.94 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | $33.55 | $87.37 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA | $63.30 | $33.55 | $96.85 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN | $61.80 | $33.55 | $95.35 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA | $60.30 | $33.55 | $93.85 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING | $58.61 | $33.55 | $92.16 Bottom 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR | $51.71 | $32.80 | $84.51 Above median +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A SHOVEL, ALL EXCAVATORS, GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRA | $49.31 | $32.80 | $82.11 +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD R | $48.85 | $32.80 | $81.65 +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, BUILDING:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP | $46.54 | $32.80 | $79.34 +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER ( BROOME AND CHENANGO | $30.50 | $19.84 | $50.34 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.94 | $20.89 | $56.83 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION: PROJECTS OVER $10 MILLION (CHENANGO COUNTY:) | $46.29 | $23.31 | $69.60 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEETMETAL WORKER: PROJECTS WITH SHEETMETAL WORK CONTRACTS TOTALLING $10 MILLION OR LESS (CHENANGO COUNTY:) | $36.29 | $23.31 | $59.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER BROOME AND CHENANGO | $45.06 | $30.71 | $75.77 +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 PICKUPS; PANEL TRUCKS; FLATBOY MATERIAL TRUCKS; SINGLE-AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMEN FOOTNOTE | $37.27 | $29.29 | $66.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCKS MECHANICS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSG | $37.27 | $29.29 | $66.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTORS TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC | $37.27 | $29.29 | $66.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED; STRADDLE CARRIER; SEL | $37.47 | $29.29 | $66.76 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK-DUMP; TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF LOADED FOOTNOTES: A. PAID HOLID | $37.47 | $29.29 | $66.76 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Broome, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Broome
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Broome, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.