Highway Construction — Santa Fe, New Mexico

WD NM20260034-16062-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Santa Fe, New Mexico (construction type: highway) is $13.88/hr base + $0.44/hr fringe = $14.32/hr total package (WD NM20260034-16062-hwy, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: NM20260034-16062-hwy
Revision: 1
Construction Type: highway
State: New Mexico (NM)
County: Santa Fe
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference NM20260034View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.88 $0.44 $14.32 -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.60 $0.26 $14.86 -37% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.79 $12.74 $42.53 +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.06 $8.56 $33.62 +23% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER $14.75 $0.35 $15.10 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.44 $5.85 $28.29 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.55 $0.35 $13.90 -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.21 $0.35 $11.56 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $10.25 $0.35 $10.60 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.13 $5.04 $22.17 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.22 $0.26 $15.48 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.73 $0.26 $15.99 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.20 $0.26 $17.46 -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: (ROLLER) $16.27 $1.51 $17.78 Top 10% -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER $12.00 $0.26 $12.26 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER $16.67 $1.57 $18.24 Bottom 10% -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $17.64 $1.51 $19.15 -19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $16.43 $0.26 $16.69 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $23.24 $1.51 $24.75 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $22.08 $8.72 $30.80 +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.95 $0.26 $13.21 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.51 $0.26 $13.77 -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.04 $0.26 $15.30 -34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.96 $0.26 $13.22 -43% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Santa Fe, NM — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Santa Fe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260034-16062-hwy →