Building Construction — Hidalgo, New Mexico
WD NM20260032-14860-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ABOVE ZONE 1 RATE in Hidalgo, New Mexico (construction type: building) is $40.30/hr base + $13.41/hr fringe = $53.71/hr total package (WD NM20260032-14860-bld, Rev. 1).
Scroll down for all 42 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $21.77 | $3.98 | $25.75 Bottom 10% -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $20.36 | $5.74 | $26.10 +15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $24.08 | $10.79 | $34.87 +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.79 | $6.14 | $25.93 +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $21.39 | $2.85 | $24.24 -3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $20.79 | $0.00 | $20.79 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.13 | $4.03 | $26.16 Above median +5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.72 | $3.72 | $21.44 -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $19.64 | $2.75 | $22.39 Above median -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $28.25 | $6.62 | $34.87 +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: EXCLUDING LOW VOLTAGE WIRING FOR ALARMS | $38.00 | $9.82 | $47.82 Bottom 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET | $22.31 | $0.30 | $22.61 +3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $20.15 | $3.95 | $24.10 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR - BATT | $24.44 | $8.43 | $32.87 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $20.84 | $7.68 | $28.52 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $28.05 | $18.11 | $46.16 Above median +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION | $22.20 | $8.06 | $30.26 Top 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $28.05 | $18.11 | $46.16 +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.12 | $3.79 | $16.91 Above median -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | $0.24 | $10.84 Above median -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $13.77 | $4.35 | $18.12 Above median -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | $0.85 | $12.36 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.78 | $2.20 | $15.98 Above median -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $22.13 | $4.30 | $26.43 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $21.13 | $4.83 | $25.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $21.39 | $4.94 | $26.33 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $16.58 | $1.75 | $18.33 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | $59.67 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $17.65 | $7.15 | $24.80 Bottom 10% +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $43.07 | $16.60 | $59.67 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR ( BOBCAT/SKID LOADER, LOADER) | $27.70 | $4.65 | $32.35 Top 10% +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR ( CRANE) | $31.43 | $4.65 | $36.08 Top 10% +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR ( ROLLER) | $26.75 | $4.65 | $31.40 Top 10% +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $13.24 | $0.50 | $13.74 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $37.50 | $18.51 | $56.01 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 Above median +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $14.02 | $0.00 | $14.02 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $19.00 | $0.00 | $19.00 +2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.36 | $5.00 | $20.36 Above median -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: PICKUP TRUCK | $15.91 | $3.13 | $19.04 Top 10% -18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $16.25 | $5.00 | $21.25 Above median -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Hidalgo, NM — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Hidalgo
Compliance Notes
- This wage determination applies to federal contracts for building construction in Hidalgo, New Mexico.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.