Building Construction — Curry, New Mexico

WD NM20260016-14899-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ABOVE ZONE 1 RATE in Curry, New Mexico (construction type: building) is $40.30/hr base + $13.41/hr fringe = $53.71/hr total package (WD NM20260016-14899-bld, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: NM20260016-14899-bld
Revision: 1
Construction Type: building
State: New Mexico (NM)
County: Curry
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference NM20260016View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ABOVE ZONE 1 RATE $40.30 $13.41 $53.71 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $21.77 $3.98 $25.75 Bottom 10% -16% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.36 $5.74 $26.10 +15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $29.09 $16.20 $45.29 +81% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $19.79 $6.14 $25.93 +4% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $20.79 $0.00 $20.79 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $20.86 $0.35 $21.21 Bottom 10% -15% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.72 $3.72 $21.44 -8% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $19.64 $2.75 $22.39 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $21.38 $5.35 $26.73 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.25 $6.62 $34.87 +27% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $22.31 $0.30 $22.61 +3% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $20.15 $3.95 $24.10 +9% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - BATT $24.44 $8.43 $32.87 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.84 $7.68 $28.52 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.05 $18.11 $46.16 Above median +26% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION $22.20 $8.06 $30.26 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.05 $18.11 $46.16 +26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.15 $4.38 $19.53 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.60 $0.24 $10.84 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.77 $4.35 $18.12 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.51 $0.85 $12.36 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.78 $2.20 $15.98 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $22.13 $4.30 $26.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.13 $4.83 $25.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $22.04 $4.70 $26.74 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $16.58 $1.75 $18.33 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $43.07 $16.60 $59.67 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $17.65 $7.15 $24.80 Bottom 10% +9% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.07 $16.60 $59.67 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( BOBCAT/SKID LOADER, LOADER) $27.70 $4.65 $32.35 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( CRANE) $31.43 $4.65 $36.08 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( ROLLER) $26.75 $4.65 $31.40 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.24 $0.50 $13.74 -36% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.50 $18.51 $56.01 +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $22.01 $9.65 $31.66 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $14.02 $0.00 $14.02 -25% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $19.00 $0.00 $19.00 +2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.14 $5.48 $21.62 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $15.91 $3.13 $19.04 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $16.25 $5.00 $21.25 Above median -9% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Curry, NM — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.