Heavy Construction — Warren, New Jersey

WD NJ20260066-16040-hvy · Revision 2 · Effective May 19, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER in Warren, New Jersey (construction type: heavy) is $57.42/hr base + $34.02/hr fringe = $91.44/hr total package (WD NJ20260066-16040-hvy, Rev. 2).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: NJ20260066-16040-hvy
Revision: 2
Construction Type: heavy
State: New Jersey (NJ)
County: Warren
Effective: May 19, 2026
Trades covered: 22
Official source: SAM.gov reference NJ20260066View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER $57.42 $34.02 $91.44 +207% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: SCAFFOLD BUILDER. The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter $57.42 $34.02 $91.44 +207% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $49.60 $37.96 $87.56 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS $65.43 $42.86 $108.29 +208% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS $71.97 $46.42 $118.39 +237% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $48.44 $49.37 $97.81 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $50.74 $49.37 $100.11 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: CEMENT/CONCRETE $29.35 $23.07 $52.42 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZ $50.95 $38.53 $89.48 +195% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR $51.65 $38.53 $90.18 +197% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT. Work of erection and dismantling of elevators and towers, such as concrete conveyors and tempoaray material elevators, scaffolding or othe $58.84 $35.06 $93.90 +175% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: (WORK ON BRIDGES) $58.28 $33.85 $92.13 Top 10% +218% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $29.05 $18.91 $47.96 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $40.19 $22.72 $62.91 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (WARREN COUNTY (TOWN OF BELVIDERE; TOWNSHIP OF FRANKLIN; TOWNSHIPS OF GREENWICH, HARMONY, HOPE, LOPATCONG AND OXFORD; TOWN OF PHILLIPSBURG $56.34 $50.80 $107.14 +189% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (WARREN COUNTY (TOWNSHIP OF ALLAMUCHY; BOROUGH OF ALPHA; TOWNSHIP OF BLAIRSTOWN; TOWNSHIP OF FRANKLIN; TOWNSHIP OF FRELINGHUYSEN; TOWN OF H $57.97 $40.22 $98.19 +165% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E $61.72 $37.50 $99.22 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S $60.13 $37.50 $97.63 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR; CRUSHER; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLE $58.22 $37.50 $95.72 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; ROLLER, GRADE; PUMP. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STA $56.59 $37.50 $94.09 +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $52.88 $37.50 $90.38 +123% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: DUMP TRUCK; FLATBED TRUCK; PICKUP TRUCK; VACUUM TRUCK. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS $48.78 $42.66 $91.44 +194% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Warren, NJ — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Warren

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NJ20260066-16040-hvy →