Building Construction — Salem, New Jersey

WD NJ20260041-16454-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Salem, New Jersey (construction type: building) is $47.34/hr base + $30.99/hr fringe = $78.33/hr total package (WD NJ20260041-16454-bld, Rev. 1).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: NJ20260041-16454-bld
Revision: 1
Construction Type: building
State: New Jersey (NJ)
County: Salem
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference NJ20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $47.34 $30.99 $78.33 Above median +192% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION $57.42 $34.17 $91.59 +208% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $49.57 $37.06 $86.63 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING D $71.85 $38.44 $110.29 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING $55.05 $48.76 $103.81 +195% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE $46.51 $34.39 $80.90 +130% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $53.24 $40.40 $93.64 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $54.24 $40.40 $94.64 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $64.66 $40.97 $105.63 Top 10% $0.00 $0.00 $0.00 $0.00
MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT $35.95 $21.85 $57.80 $0.00 $0.00 $0.00 $0.00
MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT $38.95 $21.85 $60.80 $0.00 $0.00 $0.00 $0.00
MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT $46.03 $34.27 $80.30 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAY: ELECTION DAY $62.62 $50.66 $113.28 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAY: ELECTION DAY $35.13 $24.76 $59.89 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $52.88 $37.50 $90.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $58.22 $37.50 $95.72 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $60.13 $37.50 $97.63 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $61.72 $37.50 $99.22 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $45.55 $29.86 $75.41 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $45.55 $29.86 $75.41 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $56.30 $50.76 $107.06 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $42.33 $0.00 $42.33 -6% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION $56.30 $50.76 $107.06 +189% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $57.42 $34.17 $91.59 Above median +224% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLERS $60.83 $30.34 $91.17 +146% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLERS (SALEM COUNTY) $59.19 $36.51 $95.70 +158% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $61.77 $42.82 $104.59 Top 10% $0.00 $0.00 $0.00 $0.00
THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTO $28.37 $21.62 $49.99 $0.00 $0.00 $0.00 $0.00
TILE SETTER $52.31 $38.01 $90.32 Top 10% +220% vs market $0.00 $0.00 $0.00 $0.00
WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL $49.96 $35.11 $85.07 $0.00 $0.00 $0.00 $0.00
WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY $43.63 $32.12 $75.75 $0.00 $0.00 $0.00 $0.00
WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES $58.84 $35.06 $93.90 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Salem, NJ — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Salem

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NJ20260041-16454-bld →