Building Construction — Monmouth, New Jersey

WD NJ20260037-16041-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and mach in Monmouth, New Jersey (construction type: building) is $28.37/hr base + $21.62/hr fringe = $49.99/hr total package (WD NJ20260037-16041-bld, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: NJ20260037-16041-bld
Revision: 1
Construction Type: building
State: New Jersey (NJ)
County: Monmouth
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference NJ20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and mach $28.37 $21.62 $49.99 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: (MONMOUTH COUNTY). PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 H $55.80 $40.80 $96.60 +260% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP $51.74 $46.20 $97.94 +265% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER Work on high stacks: 22% per hour additional $45.20 $33.26 $78.46 +117% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $57.42 $34.17 $91.59 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $53.21 $33.42 $86.63 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
COUNTY LINE)) $67.97 $39.35 $107.32 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN & CABLE SPLICER $57.70 $45.92 $103.62 +195% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid $71.85 $38.44 $110.29 $0.00 $0.00 $0.00 $0.00
GLAZIER WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEI $52.68 $31.29 $83.97 +158% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $49.94 $50.32 $100.26 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $52.24 $50.32 $102.56 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $59.57 $46.45 $106.02 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: SERVICE AND REPAIR $46.23 $29.23 $75.46 +103% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $38.37 $31.64 $70.01 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $59.57 $46.45 $106.02 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: SERVICE AND REPAIR $46.23 $29.23 $75.46 +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E $61.72 $37.50 $99.22 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S $60.13 $37.50 $97.63 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTO $58.22 $37.50 $95.72 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDO $56.59 $37.50 $94.09 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $52.88 $37.50 $90.38 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (MONMOUTH COUNTY Mop person: $.30 per hour additional. Work on a job where pitch is being applied: $.50 per hour additional $44.52 $32.25 $76.77 +118% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, ALL OTHER WORK (MONMOUTH COUNTY) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY $46.03 $34.27 $80.30 +128% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, SHINGLES (MONMOUTH COUNTY) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW C $35.95 $21.85 $57.80 +64% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, SLATE AND TILE (MONMOUTH COUNTY) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY $38.95 $21.85 $60.80 +72% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $59.08 $47.06 $106.14 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLERS $69.97 $41.35 $111.32 +200% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLERS (MERCER COUNTY) $59.19 $36.51 $95.70 +158% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER (MONMOUTH COUNTY) $64.90 $37.28 $102.18 +262% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Monmouth, NJ — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Monmouth

Compliance Notes

Full Davis-Bacon compliance guide →