The Davis-Bacon prevailing wage for BRICKLAYER (HUNTERDON COUNTY; MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGH OF DUNELLEN; TOWNSHIP OF EDISON; TOWNSHIP OF PISCATAWAY; BOROUGH OF SOUTH in Mercer, New Jersey (construction type: highway) is $49.57/hr base + $37.06/hr fringe = $86.63/hr total package (WD NJ20260001-16047-hwy, Rev. 2).

Scroll down for all 59 trade classifications covered by this determination.

WD Number: NJ20260001-16047-hwy
Revision: 2
Construction Type: highway
State: New Jersey (NJ)
County: Mercer
Effective: May 17, 2026
Trades covered: 59
Official source: SAM.gov reference NJ20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER (HUNTERDON COUNTY; MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGH OF DUNELLEN; TOWNSHIP OF EDISON; TOWNSHIP OF PISCATAWAY; BOROUGH OF SOUTH $49.57 $37.06 $86.63 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL $57.70 $45.92 $103.62 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $57.42 $34.02 $91.44 Top 10% +207% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $53.21 $33.72 $86.93 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON CEMENT MASON: EPOXY, ACID AND LATEX WORK: $.50 PER HOUR ADDITIONAL $45.20 $33.26 $78.46 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
DOCK BUILDER & PILEDRIVERMEN WORK ON LAND PILE DRIVING, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $.25 PER HOUR ADDI $52.98 $52.44 $105.42 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE; TOWNSHIP OF EAST AMWELL; BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE; TOWNSHIP OF RARITAN; BOROUG $37.35 $27.17 $64.52 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE SPLICER (BURLINGTON COUNTY; MERCER COUNTY $63.82 $41.99 $105.81 Top 10% +201% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS:, CABLE SPLICER (MIDDLESEX COUNTY; SOMERSET COUNTY (TOWNSHIP OF FRANKLIN):) WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDI $45.20 $33.26 $78.46 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS:, ELECTRICIAN (MIDDLESEX COUNTY; SOMERSET COUNTY (TOWNSHIP OF FRANKLIN):) WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITI $59.29 $33.56 $92.85 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS:: ELECTRICIAN AND CABLE SPLICER (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BO $55.05 $48.76 $103.81 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $54.24 $40.40 $94.64 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: HIGHWAY CONSTRUCTION: (ATLANTIC COUNTY; BURLINGTON COUNTY; CAPE MAY COUNTY; CUMBERLAND COUNTY; OCEAN COUNTY $54.24 $40.40 $94.64 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: REINFORCING (MONMOUTH COUNTY; OCEAN COUNTY $49.94 $50.32 $100.26 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL (MONMOUTH COUNTY; OCEAN COUNTY $52.24 $50.32 $102.56 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK $50.95 $38.53 $89.48 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: BLASTER PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESI $55.45 $38.53 $93.98 Top 10% +209% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: FINISHER; RAMMER; SETTER OF BRICK OR STONE PAVERS; HARDSCAPING; GUNITE NOZZLE PERSON; STONECUTTER; FORM $51.90 $38.53 $90.43 Top 10% +198% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: PIPELAYER; LASER PERSON; CONDUIT AND DUCT LINE LAYER; JACKHAMMER; CHIPPING HAMMER; PAVEMENT BREAKER; CON $51.65 $38.53 $90.18 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: GROUP 1 BASIC LABORER; LANDSCAPE LABORER; RAILROAD TRACK LABORER; UTILITY METER INSTALLER; TRAFFIC DIRECTOR/FLAG PERSO $50.95 $38.53 $89.48 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: GROUP 2 PIPELAYER; LASER PERSON; CONDUIT AND DUCT LINE LAYER; JACKHAMMER; CHIPPING HAMMER; PAVEMENT BREAKER; CONCRETE $51.65 $38.53 $90.18 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: GROUP 3 FINISHER; RAMMER; SETTER OF BRICK OR STONE PAVERS; HARDSCAPING; GUNITE NOZZLE PERSON; STONECUTTER; FORM SETTER $51.90 $38.53 $90.43 Top 10% +198% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HIGHWAY CONSTRUCTION: GROUP 4 BLASTER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE $55.45 $38.53 $93.98 Top 10% +209% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: ALL OTHER WORK: BURLINGTON COUNTY; MERCER COUNTY $61.84 $40.04 $101.88 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: ALL OTHER WORK: BURLINGTON COUNTY; MERCER COUNTY $49.47 $32.03 $81.50 Bottom 10% +46% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: ALL OTHER WORK: WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL $53.35 $38.81 $92.16 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS $61.84 $40.04 $101.88 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS $49.47 $32.03 $81.50 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS $45.55 $29.86 $75.41 Bottom 10% +35% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIO $53.35 $38.81 $92.16 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIO $53.12 $38.81 $91.93 Bottom 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: GROUNDMEN (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE $30.88 $33.36 $64.24 Top 10% +15% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: HEAVY EQUIPMENT OPERATOR (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BO $46.12 $42.70 $88.82 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION:: LINEMAN (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DE $57.65 $49.77 $107.42 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: (WORK ON BRIDGES) $53.21 $33.42 $86.63 Above median +199% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: BRUSH AND ROLLER $51.77 $39.65 $91.42 Top 10% +215% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: SPRAY $53.24 $40.40 $93.64 Top 10% +223% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVID $46.73 $41.69 $88.42 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE - COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE TRIMMER; AUTOGRADE PLACER - TRIMMER SPREADER COMBIN $61.72 $37.50 $99.22 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 ""A"" FRAME/BACKHOE COMBINATION; BOOM ATTACHMENT ON LOADER; BORING AND DRILLING MACHINE; BRUSH CHOPPER, SHREDDER AN $60.13 $37.50 $97.63 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT CURBING MACHINE; ASPHALT PLANT ENGINEER; ASPHALT SPREADER; AUTOGRADE TUBE FINISHING AND TEXTURING MACHINE $58.22 $37.50 $95.72 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BROOM AND SWEEPER; CHIPPER; COMPRESSOR; CONCRETE SPREADER; CONVEYOR LOADER; ENGINE, LARGE DIESEL AND STAGING PUMP $56.59 $37.50 $94.09 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER; TIRE REPAIR AND MAINTENANCE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS $52.88 $37.50 $90.38 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOT; HELICOPTER ENGINEER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDO $63.54 $37.50 $101.04 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: ""A"" FRAME; CHERRY PICKER; HOIST; JACK (SCREW, AIR, HYDRAULIC POWER-OPERATED UNIT OR CONSOLE TYPE; SIDE B $58.63 $37.50 $96.13 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: AERIAL PLATFORM USED AS A HOIST; COMPRESSOR, TWO OR THREE IN BATTERY; DIRECTIONAL BORING MACHINE; ELEVATOR $57.10 $37.50 $94.60 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: COMPRESSOR, SINGLE; OFF-ROAD BACK DUMP; WELDING MACHINE; WELDING SYSTEM, MULTIPLE; GENERATOR, SINGLE HAZAR $53.34 $37.50 $90.84 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: CRANES; DERRICKS HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SIT $68.58 $37.50 $106.08 Bottom 10% +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: CRANES; DERRICKS HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SIT $70.24 $37.50 $107.74 Top 10% +166% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SIT $61.29 $37.50 $98.79 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE $65.74 $37.50 $103.24 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 1 DRIVERS OF THE FOLLOWING TYPE VEHICLES: DUMP, FLAT, FLOAT, PICK-UP, CONTAINER HAULER, FUEL, WATER SPRINKLER, ROAD OIL, STRINGE $48.88 $42.66 $91.54 Top 10% +194% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 2 DRIVER OF 3-AXLE TRUCKS AND FLOATS (BURLINGTON COUNTY; MERCER, MONMOUTH AND OCEAN COUNTIES:) HAZARDOUS WASTE REMOVAL WORK: WOR $48.78 $42.66 $91.44 Top 10% +194% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 2 TRUCK DRIVER, DUMP TRUCK DRIVER, WATER TRUCK DRIVER, TRANSIT MIX DRIVER, PICK-UP TRUCK DRIVER, TANK TRUCK DRIVER, TRACK TRUCK $48.23 $25.98 $74.21 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 3 DRIVER OF ALL EUCLID-TYPE VEHICLES: EUCLID, INTERNATIONAL HARVESTER, WABCO, CATERPILLAR, KOEHRING TRACTOR AND WAGON, DUMPTOR $48.68 $42.66 $91.34 Top 10% +194% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 3 TOW TRUCK DRIVER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $48.23 $25.98 $74.21 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 4 TRAILER TRUCK DRIVER, WINCH TRUCK DRIVER, OFF-ROAD DUMP TRUCK DRIVER, FUEL TRUCK DRIVER, TRACTOR TRAILER DRIVER, ASPHALT OIL D $48.58 $25.98 $74.56 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 4 WINCH TRAILER DRIVER (BURLINGTON COUNTY; MERCER, MONMOUTH AND OCEAN COUNTIES) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR $48.63 $42.66 $91.29 Top 10% +193% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:, GROUP 5 MECHANIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DI $48.58 $25.98 $74.56 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mercer, NJ — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.