Heavy Construction — Hunterdon, New Jersey

WD NJ20260055-16037-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO R in Hunterdon, New Jersey (construction type: heavy) is $62.09/hr base + $45.05/hr fringe = $107.14/hr total package (WD NJ20260055-16037-hvy, Rev. 2).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: NJ20260055-16037-hvy
Revision: 2
Construction Type: heavy
State: New Jersey (NJ)
County: Hunterdon
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference NJ20260055View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
(HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO R $62.09 $45.05 $107.14 $0.00 $0.00 $0.00 $0.00
(HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO R $56.34 $50.80 $107.14 $0.00 $0.00 $0.00 $0.00
(HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO R $59.57 $46.45 $106.02 $0.00 $0.00 $0.00 $0.00
(HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO R $46.23 $29.23 $75.46 $0.00 $0.00 $0.00 $0.00
CEMENT MASON $49.60 $37.96 $87.56 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE; TOWNSHIP OF EAST AMWELL; BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE; TOWNSHIP OF RARITAN; BOROUG $63.82 $41.99 $105.81 Top 10% +201% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING (HUNTERDON COUNTY) $49.94 $50.32 $100.26 +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING (HUNTERDON COUNTY) $53.24 $38.40 $91.64 +70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY) $52.24 $50.32 $102.56 +91% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY) $54.24 $38.40 $92.64 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: CEMENT/CONCRETE $29.35 $23.07 $52.42 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY $51.65 $38.53 $90.18 Top 10% $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY $50.95 $38.53 $89.48 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $52.88 $37.50 $90.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $58.22 $37.50 $95.72 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $60.13 $37.50 $97.63 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $61.72 $37.50 $99.22 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $29.05 $18.91 $47.96 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $40.19 $22.72 $62.91 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: WORK ON BRIDGES $58.28 $33.85 $92.13 Top 10% +218% vs market $0.00 $0.00 $0.00 $0.00
THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER $57.42 $34.17 $91.59 Top 10% $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION; 125 DAYS RECEIVE TWO WEEKS PAID VACATI $48.63 $42.66 $91.29 Bottom 10% $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION; 125 DAYS RECEIVE TWO WEEKS PAID VACATI $48.78 $42.66 $91.44 Top 10% $0.00 $0.00 $0.00 $0.00
WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPE $64.53 $42.27 $106.80 $0.00 $0.00 $0.00 $0.00
WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPE $71.97 $46.42 $118.39 $0.00 $0.00 $0.00 $0.00
WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES $58.84 $35.06 $93.90 Top 10% $0.00 $0.00 $0.00 $0.00
WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGN $52.02 $39.23 $91.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGN $52.98 $52.44 $105.42 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hunterdon, NJ — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hunterdon

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NJ20260055-16037-hvy →