Building Construction — Hudson, New Jersey
WD NJ20260033-16044-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and mach in Hudson, New Jersey (construction type: building) is $28.37/hr base + $21.62/hr fringe = $49.99/hr total package (WD NJ20260033-16044-bld, Rev. 1).
Scroll down for all 36 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and mach | $28.37 | $21.62 | $49.99 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $51.74 | $46.20 | $97.94 Top 10% +265% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional | $49.60 | $37.96 | $87.56 +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $57.42 | $34.17 | $91.59 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 | $91.59 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $54.64 | $30.95 | $85.59 Top 10% +181% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 Above median +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 | $62.90 | $39.31 | $102.21 +191% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN CABLE Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above | $73.59 | $45.99 | $119.58 +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC | $40.21 | $11.22 | $51.43 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $38.85 | $0.14 | $38.99 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER | $64.66 | $40.97 | $105.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - Work on high stacks: 22% per hour additional | $49.60 | $37.96 | $87.56 +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $45.55 | $29.86 | $75.41 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (HUDSON COUNTY) | $57.97 | $40.22 | $98.19 +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $54.64 | $30.95 | $85.59 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $62.09 | $45.05 | $107.14 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E | $61.72 | $37.50 | $99.22 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S | $60.13 | $37.50 | $97.63 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTO | $58.22 | $37.50 | $95.72 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDO | $56.59 | $37.50 | $94.09 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER | $52.88 | $37.50 | $90.38 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $44.52 | $32.25 | $76.77 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER (HUDSON COUNTY) | $50.25 | $39.62 | $89.87 +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $51.30 | $51.55 | $102.85 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $57.42 | $34.17 | $91.59 Above median +224% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $67.97 | $39.35 | $107.32 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $64.90 | $37.28 | $102.18 Top 10% +262% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct con | $47.36 | $44.02 | $91.38 +194% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct c | $47.51 | $44.02 | $91.53 +194% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures | $58.84 | $35.06 | $93.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| Work welding or using a cutting torch: $1.00 per hour additional. Work on a swing stage scaffold; on a pipe scaffold providing the working height of t | $52.68 | $31.29 | $83.97 | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Hudson, NJ — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Hudson
Compliance Notes
- This wage determination applies to federal contracts for building construction in Hudson, New Jersey.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.